Difference between revisions of "PVC Roof System Details"

Jump to: navigation, search

Difference between revisions of "PVC Roof System Details"

(Part 10 - Perimeters and Walls)
 
Line 43: Line 43:
  
 
===Part 10 - Perimeters and Walls===
 
===Part 10 - Perimeters and Walls===
 +
====='''General Application''' ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])=====
 +
<ol>
 +
<li>[[PVC Membrane Termination A | Membrane Termination A]]
 +
<li>[[PVC Membrane Termination B | Membrane Termination B]]
 +
<li>[[PVC Membrane Termination C | Membrane Termination C]]
 +
<li>[[PVC Membrane Termination D | Membrane Termination D]]
 +
<li>[[PVC Membrane Termination E | Membrane Termination E]]
 +
<li>[[PVC Membrane Termination F | Membrane Termination F]]
 +
</li></ol>
  
 
===Part 11 - Drainage===
 
===Part 11 - Drainage===

Latest revision as of 16:44, 26 February 2024



Division D - Construction Details

Construction Details for PVC Membrane Roof Systems
PVC Thumbnail.jpg
The drawings linked on this page are intended to represent a variety of PVC Membrane roof system applications while remaining generic with regards to manufacturer's specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about PVC Membrane System designs and requirements, see the Standard for PVC Membrane Roof Systems.

Part 12 - Penetrations and Curbs

Part 13 - Linear Metal Flashing

See the separate page, Construction Details for Linear Metal Flashings.

Part 14 - The Roof as a Platform


Standard for PVC Membrane Roof Systems

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.