;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: Optional, depending upon deck condition and roof system requirements.
 
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: Optional, depending upon deck condition and roof system requirements.
;(2) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air or Vapour Control Layer''']]: Installed following the requirements of '''Part 6''' in this Standard.  Tie field layers into curb, ensuring continuity.
+
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layer''']]: Installed following the requirements of '''Part 6''' in this Standard.  Tie field layers into curb, ensuring continuity.
;(3) [[SBS Roof Systems Standard#SBSINSULATIONAPPLICATION|'''Insulation''']]: Installed in staggered and offset layers (not illustrated), and secured in accordance with the design of the system, which is based on the ''British Columbia Building Code'', Part 4 and Part 5, and on '''Part 3''' of the '''''RoofStar Guarantee Standards''''' for the membrane system type.
+
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Installed in staggered and offset layers (not illustrated), and secured in accordance with the design of the system, which is based on the ''British Columbia Building Code'', Part 4 and Part 5, and on '''Part 3''' of the '''''RoofStar Guarantee Standards''''' for the membrane system type.
;(4) [[SBS Roof Systems Standard#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Subject to the requirements of '''Part 8''' in the '''''RoofStar Guarantee Standards''''' for the membrane system type.
+
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Subject to the requirements of '''Part 8''' in the '''''RoofStar Guarantee Standards''''' for the membrane system type.
 
;(5) Primer for Base Membrane Flashing: As required by the membrane manufacturer.
 
;(5) Primer for Base Membrane Flashing: As required by the membrane manufacturer.
;(6) [[SBS Roof Systems Standard#SBSMEMBRANES|'''Base Membrane (field)''']]: Mechanically attached, torch-applied, adhered or self-adhered.  See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options.  See '''9.3''' for application requirements.
+
;(6) [[SBS Roof Systems Standard#PART_9|'''Base Membrane (field)''']]: Mechanically attached, torch-applied, adhered or self-adhered.  See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options.  See '''9.3''' for application requirements.
;(7) [[SBS Roof Systems Standard#SBSPERIMETERS|'''Base Membrane (flashing)''']]: Carried vertically up a wall or parapet at least 200 mm (8”), and onto the roof field at least 100 mm (4”) (greater if required by the membrane manufacturer).
+
;(7) [[SBS Roof Systems Standard#PART-10|'''Base Membrane (flashing)''']]: Carried vertically up a wall or parapet at least 200 mm (8”), and onto the roof field at least 100 mm (4”) (greater if required by the membrane manufacturer).
;(8) [[SBS Roof Systems Standard#SBSMEMBRANES|'''Cap Membrane (field)''']]: Granule-surfaced membrane.  See Tables '''9.1''' and '''9.2''' for acceptable cap membrane types and their securement options.  See '''9.3''' for application requirements.
+
;(8) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Granule-surfaced membrane.  See Tables '''9.1''' and '''9.2''' for acceptable cap membrane types and their securement options.  See '''9.3''' for application requirements.
;(9) [[SBS Roof Systems Standard#SBSPERIMETERS|'''Cap Membrane (flashing)''']]: Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge.
+
;(9) [[SBS Roof Systems Standard#PART_10|'''Cap Membrane (flashing)''']]: Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge.
;(10)[[SBS Roof Systems Standard#SBSMETALCAP|'''Metal Counter-flashing''']]: Secure metal flashings with appropriate fasteners set at least 87 mm (3 ½”) above the finished roof surface.
+
;(10)[[SBS Roof Systems Standard#PART_13|'''Metal Counter-flashing''']]: Secure metal flashings with appropriate fasteners set at least 87 mm (3 ½”) above the finished roof surface.
  
 
<hr>
 
<hr>

Revision as of 14:36, 1 September 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

SBS 11.3.3.2-1 Basic Curb.jpg

Click below for a printable version of this page (under development)
Print Sheet

1 WORK INCLUDED

(1) Supporting Deck Overlay
Optional, depending upon deck condition and roof system requirements.
(2) Air or Vapour Control Layer
Installed following the requirements of Part 6 in this Standard. Tie field layers into curb, ensuring continuity.
(3) Insulation
Installed in staggered and offset layers (not illustrated), and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on Part 3 of the RoofStar Guarantee Standards for the membrane system type.
(4) Insulation Overlay
Subject to the requirements of Part 8 in the RoofStar Guarantee Standards for the membrane system type.
(5) Primer for Base Membrane Flashing
As required by the membrane manufacturer.
(6) Base Membrane (field)
Mechanically attached, torch-applied, adhered or self-adhered. See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
(7) Base Membrane (flashing)
Carried vertically up a wall or parapet at least 200 mm (8”), and onto the roof field at least 100 mm (4”) (greater if required by the membrane manufacturer).
(8) Cap Membrane (field)
Granule-surfaced membrane. See Tables 9.1 and 9.2 for acceptable cap membrane types and their securement options. See 9.3 for application requirements.
(9) Cap Membrane (flashing)
Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge.
(10)Metal Counter-flashing
Secure metal flashings with appropriate fasteners set at least 87 mm (3 ½”) above the finished roof surface.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Curb
(C) Insulation
(D) Mechanical Unit and Gasket (installed on curb)

NOTE: See the Standard for additional requirements.