Difference between revisions of "SBS Flanged Insert Drain (Clamping Ring)"

Jump to: navigation, search

Difference between revisions of "SBS Flanged Insert Drain (Clamping Ring)"

Line 49: Line 49:
 
<hr>
 
<hr>
  
[[SBS Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
+
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS-modified Bitumen Membrane Roof System Details'']]
  
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 14:53, 30 August 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

D1.7.8-3.jpg

Click below for a printable version of this page.
Print Sheet


1 WORK INCLUDED

(1) Supporting Deck Overlay
Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
(5) Field Base Membrane
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to RoofStar Guarantee Standards. Torching directly to wood surfaces is not permitted.
(6) Mastic
Compatible mastic accepted by the membrane manufacturer.
(7) Base Membrane Flashing
Adhered according to manufacturer's specifications and to RoofStar Guarantee Standards.
(8) Field Cap Membrane
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Clamping Copper Drain
Primed and mechanically fastened. Installed in bed of compatible mastic.
  • Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.

NOTE: See the Standard for additional requirements.