=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[SBS Roof Systems Standard#SBSSUBSTRATES|'''Supporting Deck Overlay''']]: Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
+
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
;(2) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: If required by design authority.
+
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority.
;(3) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: Mechanically fastened.  See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fastened.  See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
;(4) [[SBS Roof Systems Standard#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
+
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
;(5) [[SBS Roof Systems Standard#SBSBASE|'''Field Base Membrane''']]: Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to <i>RoofStar Guarantee Standards</i>. Torching directly to wood surfaces is not permitted.
+
;(5) [[SBS Roof Systems Standard#PART_9|'''Field Base Membrane''']]: Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to <i>RoofStar Guarantee Standards</i>. Torching directly to wood surfaces is not permitted.
 
;(6) '''Mastic''': Compatible mastic accepted by the membrane manufacturer.
 
;(6) '''Mastic''': Compatible mastic accepted by the membrane manufacturer.
;(7) [[SBS Roof Systems Standard#SBS-STRIPPING|'''Base Membrane Flashing''']]: Adhered according to manufacturer's specifications and to <i>RoofStar Guarantee Standards.</i>
+
;(7) [[SBS Roof Systems Standard#PART_10|'''Base Membrane Flashing''']]: Adhered according to manufacturer's specifications and to <i>RoofStar Guarantee Standards.</i>
;(8) [[SBS Roof Systems Standard#SBSBASE|'''Field Cap Membrane''']]: Applied according to manufacturer's printed instructions and to <i>RoofStar Guarantee Standards</i>.
+
;(8) [[SBS Roof Systems Standard#PART_9|'''Field Cap Membrane''']]: Applied according to manufacturer's printed instructions and to <i>RoofStar Guarantee Standards</i>.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']]
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]
;(B) [[SBS Roof Systems Standard#SBSSPUNDRAINMATERIALS|'''Clamping Copper Drain''']]: Primed and mechanically fastened. Installed in bed of compatible mastic.
+
;(B) [[SBS Roof Systems Standard#PART_11|'''Clamping Copper Drain''']]: Primed and mechanically fastened. Installed in bed of compatible mastic.
  
 
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
 
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.

Revision as of 18:49, 1 September 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

D1.7.8-3.jpg

Click below for a printable version of this page.
Print Sheet


1 WORK INCLUDED

(1) Supporting Deck Overlay
Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
(5) Field Base Membrane
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to RoofStar Guarantee Standards. Torching directly to wood surfaces is not permitted.
(6) Mastic
Compatible mastic accepted by the membrane manufacturer.
(7) Base Membrane Flashing
Adhered according to manufacturer's specifications and to RoofStar Guarantee Standards.
(8) Field Cap Membrane
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Clamping Copper Drain
Primed and mechanically fastened. Installed in bed of compatible mastic.
  • Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details