Search results

Jump to: navigation, search

Search results

Page title matches

  • 174 bytes (24 words) - 16:38, 27 November 2015
  • #REDIRECT [[Section:A. About]]
    30 bytes (4 words) - 19:40, 24 November 2015
  • <big><big><big><big><big>Asphalt Shingles | Flashing a Masonry Chimney ([[Asphalt_Shingle_Systems_Standard#12.3.2.4. Curbs | Artic
    1 KB (171 words) - 14:35, 30 June 2022
  • ...a fa-hand-o-right" aria-hidden="true"></i> <big>Requesting and Specifying a RoofStar Guarantees</big>]]
    643 bytes (78 words) - 18:53, 27 July 2016
  • {{Special:PrefixIndex/Materials:A}}
    286 bytes (38 words) - 19:15, 12 October 2016
  • <big><big>Division A - Scope, Use of Standards, and Guarantee </big></big> <big><big><big><big><big>Part 4 - Specifying a RoofStar Guarantee</big></big></big></big></big>
    2 KB (304 words) - 16:39, 19 September 2023
  • ...standards as published in the '''RoofStar Roofing Practices Manual''' for a RoofStar 5-Year, RoofStar 10-Year or RoofStar 5-Year Waterproofing guarante
    1 KB (191 words) - 17:16, 22 August 2016
  • ...dards''''' as published in the '''RoofStar Roofing Practices Manual''' for a '''''RoofStar Guarantee''''', unless modified by the contract documents to
    1 KB (181 words) - 18:25, 19 August 2021
  • 51 bytes (6 words) - 17:05, 28 June 2022
  • :<big>[[Draft Divison A]]</big> ===Division A (Scope, Use of Standards, and Guarantee )===
    1 KB (195 words) - 15:12, 26 October 2023
  • <big><big><big><big><big>TPO | Membrane Termination A (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requireme ...lass=img-responsive | link=https://rpm.rcabc.org/images/f/fb/10.3.2.3.-TPO-A.png]]
    6 KB (842 words) - 16:35, 26 February 2024
  • <big><big><big><big><big>PVC | Membrane Termination A (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requireme ...lass=img-responsive | link=https://rpm.rcabc.org/images/f/fc/10.3.2.3.-PVC-A.png]]
    6 KB (842 words) - 16:41, 26 February 2024
  • <big><big><big><big><big>SBS | Membrane Termination A (Wall) ([[SBS_Roof_Systems_Standard#10.3.2.3._General_Application_Requireme ...lass=img-responsive | link=https://rpm.rcabc.org/images/d/dd/10.3.2.3.-SBS-A.png]]
    6 KB (861 words) - 15:55, 26 February 2024
  • <big><big><big><big><big>EPDM | Membrane Termination A (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirem ...ass=img-responsive | link=https://rpm.rcabc.org/images/5/53/10.3.2.3.-EPDM-A.png]]
    6 KB (840 words) - 16:26, 26 February 2024
  • [[File:Division A page thumb.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/8/81
    975 bytes (130 words) - 17:44, 2 September 2021
  • 0 bytes (0 words) - 18:19, 2 September 2021
  • :<big><big><big><big><big>Division A: Scope, Use of Standards, and Guarantee</big></big></big></big></big> [[File:Division A page thumb.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/8/81
    1 KB (185 words) - 16:52, 31 January 2022

Page text matches

  • <big>[[Division A | '''Division A: Scope, Use of Standards, and Guarantee''']]</big> ...chnical-updates/" target="_blank"><big><big>Technical Updates</big></big></a></html>
    11 KB (1,530 words) - 13:58, 26 June 2023
  • ...Planning session at which the members in attendance strongly advocated for a new name and increased marketing efforts aimed to build the Guarantee Progr Enter a word, a phrase or a section number into the search window and all of the sections these words a
    3 KB (537 words) - 20:47, 21 October 2016
  • ...S for a RoofStar Five (5) Year or Ten (10) Year Roofing Guarantee, and for a RoofStar Five (5) Year Waterproofing Guarantee.</big> This list of acceptable materials is not intended for use as a comparison of material performance or quality. It is the sole responsibilit
    4 KB (526 words) - 16:18, 17 March 2019
  • ...ete set of the manufacturer’s data or specifications. The preparation of a detailed specification is the responsibility of the design authority. ;'''Product Summary''': A breathable non-woven waterproof roofing underlayment.
    1,008 bytes (127 words) - 16:23, 26 February 2018
  • The ability of a membrane to resist being worn away by contact with a moving abrasive surface, such as foot traffic, mechanical equipment, wind-b
    165 bytes (26 words) - 20:12, 5 November 2018
  • ...s is an <u>information page only</u>. To read the standards applicable to a particular Waterproofing or Water-shedding System, refer to the actual Stan ...re not readily flammable and do not carry or communicate fire; they afford a fairly high degree of fire protection to the roof deck; they do not slip fr
    5 KB (808 words) - 16:06, 9 September 2021
  • The following is a partial listing of publications by WorkSafeBC: :A complete record of regulations which WorkSafeBC has the power to enforce in
    3 KB (432 words) - 14:39, 9 June 2017
  • -- Get the argument tables. If we were passed a valid frame object, get the -- passed a valid frame object, we are being called from another Lua module
    9 KB (1,372 words) - 22:27, 2 July 2015
  • ...up roofing felts. While offering the higher performance and versatility of a flexible membrane, SBS-modified roofing membranes are also generally compat ...ane (these fibers may be glass, polyester, or a blend of the two), and (3) a surface coating, such as stone or ceramic granules. The performance of thes
    5 KB (703 words) - 16:54, 23 November 2015
  • ...SYTEMS for a RoofStar 5-year Guarantee, RoofStar 10-year Guarantee, or for a RoofStar 15-year Guarantee.</big> ...Manual''. Furthermore, these tables and lists are not intended for use as a comparison of material performance or quality. It is the sole responsibilit
    13 KB (1,880 words) - 19:18, 1 February 2024
  • ...SYTEMS for a RoofStar 5-year Guarantee, RoofStar 10-year Guarantee, or for a RoofStar 15-year Guarantee.</big> ...Manual''. Furthermore, these tables and lists are not intended for use as a comparison of material performance or quality. It is the sole responsibilit
    3 KB (413 words) - 21:46, 14 June 2023
  • <big>What goes into a RoofStar Guaranteed roof? Learn about the Essential Elements here, and exp ...Roof|<i class="fa fa-hand-o-right" aria-hidden="true"></i> <big>Building a Roof</big>]]
    2 KB (290 words) - 20:13, 22 August 2016
  • #REDIRECT [[Section:A. About]]
    30 bytes (4 words) - 19:40, 24 November 2015
  • ...p roofing felts. While offering the higher performance and versatility of a flexible membrane, these products also offer the practical advantages of bi ...suitable bitumen. A well dispersed, homogeneous polymer mixture will form a continuous rubber network throughout the bitumen.
    22 KB (3,281 words) - 21:46, 17 July 2017
  • ...ete set of the manufacturer’s data or specifications. The preparation of a detailed specification is the responsibility of the design authority. ...ry for high insulation values and in a stair stepped fashion, facilitating a positive slope to drain.
    3 KB (474 words) - 21:16, 12 February 2019
  • ...acturers&#8217; specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the '''''RoofStar Guarantee '''NOTE''': 'PDF' shown after a file name below indicates a downloadable print sheet is available for Construction Details. Click on t
    2 KB (277 words) - 21:16, 30 August 2021
  • <big>[[Division A | '''Division A: Scope, Use of Standards, and Guarantee''']]</big> <sup><span style="color: ...dards necessary to qualify roof and grade-level waterproofing projects for a '''''RoofStar Guarantee'''''.
    11 KB (1,581 words) - 19:51, 15 November 2021
  • ...bership list and contact information at [http://www.rcabc.org/members/find-a-member/ www.rcabc.org] ;Country of Manufacture: U.S.A.
    2 KB (288 words) - 22:14, 8 September 2021
  • ...s ''Primary'' or ''Secondary Materials'' together, or is connected to/with a ''Primary'' or ''Secondary material'', but does not by its nature (apart fr ...cessory'' recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.
    2 KB (233 words) - 15:23, 27 October 2020
  • ...talled 4” or more above the maximum water line, and gutters must include a scupper overflow drain. || 2017-April-22 }}). Also refer to [[RoofStar Gua ...erlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 200 mm (8") and be installed in shingle fashion (not shown for c
    3 KB (356 words) - 14:32, 30 June 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)