(Created page with "File:6.3.5.1.jpg === WORK INCLUDED === (1) <b>Gypsum Board:</b> Required when insulation is too thin to span flutes of steel decking (See <i>RGC</i> <i>Guarantee Stand...")
 
Line 4: Line 4:
  
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
 +
;1) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness  or when required as a thermal barrier by design authority.
 +
;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOVAPOUR|'''Vapour Retarder''']]: If required by design authority.
 +
;(3) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOINSULATION|'''Insulation''']]: Mechanically attached or loose laid for ballasted roof assemblies. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 +
;(4) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer’s instructions and RoofStar Guarantee Standards.
 +
;(5) '''Mastic''': Compatible mastic or sealant.
 +
;(6) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOSTRIPPING|'''Membrane Flashing''']]: Adhered to curb according to manufacturer's printed specifications using proprietary adhesive.  Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Thermoplastic membrane may be welded or chemically bonded.
  
(1) <b>Gypsum Board:</b> Required when insulation is too thin to span flutes of steel decking (See <i>RGC</i> <i>Guarantee Standard A2.5</i>) or when required as thermal barrier by design authority.
+
<hr>
 
 
(2) <b>Vapor Retarder:</b> If required by design authority.
 
 
 
(3) <b>Insulation:</b> Mechanically attached where deck type permits or loose laid for ballasted roof assemblies. Installed according to <i>RGC</i> <i>Guarantee Standard A4.3. </i>See Section 2.2 for accepted materials.
 
 
 
(4) <b>Single Ply Membrane:</b> Installed according to manufacturer&#8217;s instructions and <i>RGC Guarantee Standards Section 2.1.1 </i>and<i> Section 2.1.3</i>.
 
 
 
(5) <b>Mastic:</b> Compatible mastic or sealant.
 
 
 
(6) <b>Membrane Flashing:</b> Adhered according to manufacturer&#8217;s printed specifications using proprietary adhesive. Thermoplastic membrane may be welded or chemically bonded (See Section 6.2) Thermoset membrane may be joined using uncured tape or proprietary adhesive (See Section 6.1).<b> </b>
 
 
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
 +
;(A) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPODECKS|'''Acceptable Deck''']]
 +
;(B) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPORD|'''Roof Drain''']]: Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
  
(A) Acceptable Deck
 
 
(B) Clamping Copper Drain: Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
 
  
NOTE:  
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
* Refer to <i>RGC Guarantee Standards</i> for additional requirements
 
 
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
 
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
  

Revision as of 15:19, 9 August 2016

6.3.5.1.jpg


1 WORK INCLUDED

1) Gypsum Deck Overlay
May be required depending on insulation thickness or when required as a thermal barrier by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
Mechanically attached or loose laid for ballasted roof assemblies. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(4) Single-ply Membrane
Installed according to manufacturer’s instructions and RoofStar Guarantee Standards.
(5) Mastic
Compatible mastic or sealant.
(6) Membrane Flashing
Adhered to curb according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Thermoplastic membrane may be welded or chemically bonded.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Roof Drain
Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.

  • Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.