Difference between revisions of "WP Details:F1.7.2 (Wearing Course - Unit Masonry)"

Jump to: navigation, search

Difference between revisions of "WP Details:F1.7.2 (Wearing Course - Unit Masonry)"

(WORK INCLUDED)
Line 1: Line 1:
 
<hr>
 
<hr>
 
[[File:9.6.2.jpg]]
 
[[File:9.6.2.jpg]]
 +
  
 
==== WORK INCLUDED ====
 
==== WORK INCLUDED ====
Line 12: Line 13:
  
 
(4) <b>Drainage Medium</b>: Proprietary (purpose-made) geocomposite drainage boards with synthetic water permeable fabric required to contain sand and gravel beds for unit masonry (pavers, bricks, and stone).
 
(4) <b>Drainage Medium</b>: Proprietary (purpose-made) geocomposite drainage boards with synthetic water permeable fabric required to contain sand and gravel beds for unit masonry (pavers, bricks, and stone).
 
  
 
==== WORK BY OTHERS ====
 
==== WORK BY OTHERS ====

Revision as of 17:24, 23 December 2015


9.6.2.jpg


1 WORK INCLUDED

(1)Primary Waterproofing Membrane: Fully adhered to acceptable substrates (concrete slab shown), installed as per RGC Guarantee Standards E and Membrane Manufacturer's installation specifications.

(2)Membrane Primer or Adhesive: Proprietary primer or adhesive, application method and quantities for substrate type as directed by membrane manufacturer's published application specifications.

(3)Protection Board/Mat: Proprietary membrane protection board or mat approved by membrane manufacturer, compatible with waterproofing membrane system, and compliant with RGC Guarantee Standards E.

(4) Drainage Medium: Proprietary (purpose-made) geocomposite drainage boards with synthetic water permeable fabric required to contain sand and gravel beds for unit masonry (pavers, bricks, and stone).

2 WORK BY OTHERS

(A) Acceptable Deck: Concrete slab depicted.

(B) Unit Masonry Wearing Coarse: Concrete brick, pavers, stone on sand and gravel or moror beds designed to support predicted live loads.

(C) Conductive Tape: Moisture Survey System (tape grid) mandatory and compliant with RGC Guarantee Standards E. For RGC accepted Moisture Survey Tape System s - refer to Section 2.2.

NOTE
Refer to RGC Guarantee Standards E for additional requirements.


Back to Waterproofing

Back to Waterproofing Construction Details

Back to Construction Details