Difference between revisions of "WP Details:F1.7.9 (Walls - Reglet & Counter-Flashings)"

Jump to: navigation, search

Difference between revisions of "WP Details:F1.7.9 (Walls - Reglet & Counter-Flashings)"

(WORK INCLUDED)
Line 1: Line 1:
 +
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 +
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
 +
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''Waterproofing Details for Plazas, Promenades and Terraces'''</big></div>
 
<div class="panel-heading"><big>'''Waterproofing Details for Plazas, Promenades and Terraces'''</big></div>
Line 10: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
(1) <b>Primary Waterproofing Membrane: </b>Fully adhered to acceptable substrates (concrete slab depicted), installed as per <{{hilite | i>RGC Guarantee Standards E </i> || 2016-November-19 }}and Membrane Manufacturer's installation specifications.  
+
(1) <b>Primary Waterproofing Membrane: </b>Fully adhered to acceptable substrates (concrete slab depicted), installed as per [[RoofStar Guarantee Standards for Waterproofing|'''RoofStar Guarantee Standards for Waterproofing Plazas, Promenades & Terraces''']] and Membrane Manufacturer's installation specifications.  
  
 
(2) <b> Membrane Flashing (stripping): </b>Carried up walls a minimum 200 mm (8") above membrane surface (Deck) and a minimum of 100mm (4") above top surface of permeable waterproofing wearing surfaces and overburdens.  
 
(2) <b> Membrane Flashing (stripping): </b>Carried up walls a minimum 200 mm (8") above membrane surface (Deck) and a minimum of 100mm (4") above top surface of permeable waterproofing wearing surfaces and overburdens.  

Revision as of 16:21, 1 September 2016

RoofStar Guarantee Standards are blue-linked
Waterproofing Details for Plazas, Promenades and Terraces

9.6.9.jpg

1 WORK INCLUDED

(1) Primary Waterproofing Membrane: Fully adhered to acceptable substrates (concrete slab depicted), installed as per RoofStar Guarantee Standards for Waterproofing Plazas, Promenades & Terraces and Membrane Manufacturer's installation specifications.

(2) Membrane Flashing (stripping): Carried up walls a minimum 200 mm (8") above membrane surface (Deck) and a minimum of 100mm (4") above top surface of permeable waterproofing wearing surfaces and overburdens.

(3) Membrane Primer or Adhesive: proprietary primer or adhesive, application and quantities as directed by membrane manufacturers published application specifications.

(4) Metal Base Flashing: Required on all waterproofing assemblies flashing lengths joined by use of S-locks or standing seam joints.

(5) Metal Counter Flashing: Set in reglet fastened with expanding type concrete pins, join flashing lengths by use of S-locks or standing seam joints.

(6) Fasteners: Suitable expanding type concrete pins.

(7) Caulking: Polyurethane sealant, fill void and tool smooth.

2 RELATED WORK BY OTHERS

(A)Concrete Wall: Must be dry, smooth and primed for membrane flashing to be adhered directly. (Plywood or fibre-mat reinforced cement board may be required).

(B)Reglet: minimum 75mm (3/4") in depth, saw cut or manufactured preformed reglet.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to Waterproofing Application

Back to Waterproofing Construction Details

Back to Construction Details