Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
m (James Klassen moved page ASh 11.1.3 Curb Flashing (Typical) to Asphalt Shingles - Curb Flashing (Typical)) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | { | + | {{Template:RPM Info}} |
− | | | + | |
− | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>Asphalt Shingles | Curb Flashing (Typical) ([[Asphalt_Shingle_Systems_Standard#12.3.2.4. Curbs | Article 12.3.2.4.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div> | <div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div> | ||
Line 7: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:7.1.5.10.jpg|class=img-responsive]] | + | [[File:7.1.5.10.jpg| link=http://rpm.rcabc.org/images/3/37/7.1.5.10.jpg | class=img-responsive]] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 14: | Line 20: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) '''Asphalt Shingles''': Installed to manufacturer’s published instructions and '''''RoofStar Guarantee Standards'''''. | ;(1) '''Asphalt Shingles''': Installed to manufacturer’s published instructions and '''''RoofStar Guarantee Standards'''''. | ||
− | ;(2) [[ | + | ;(2) [[Asphalt Shingle Systems Standard#AShPART11-APRON|'''Apron Flashing''']] |
: Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings. | : Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings. | ||
− | ;(3) [[ | + | ;(3) [[Asphalt Shingle Systems Standard#AShPART11-STEP|'''Step Flashing''']]: Interwoven with each course of shingles, 75mm (3") head lap. |
;(4) '''Final Step flashing''': Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold. | ;(4) '''Final Step flashing''': Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold. | ||
− | ;(5) [[ | + | ;(5) [[Asphalt Shingle Systems Standard#AShPART11-BACKPAN|'''Backpan Flashing''']]: The back-pan is to be extended 100mm (4") beyond the corner and folded. Apply caulking at the transition corner of the final step flashing and back pan. |
;(6) '''Capillary Section''': A capillary tab is to be extended off the end of the back pan to lead water around the corner. | ;(6) '''Capillary Section''': A capillary tab is to be extended off the end of the back pan to lead water around the corner. | ||
+ | |||
+ | *Proprietary soldered or welded diverter flashing may be used provided they conform to '''''RoofStar Guarantee Standards'''''. | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[Asphalt Shingle Systems Standard | '''Standard''']] for additional requirements. |
− | |||
<hr> | <hr> | ||
+ | [[Asphalt Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingle System Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 14:39, 30 June 2022
Division D - Construction Details
Asphalt Shingles | Curb Flashing (Typical) ( Article 12.3.2.4.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Asphalt Shingles
- Installed to manufacturer’s published instructions and RoofStar Guarantee Standards.
- (2) Apron Flashing
- Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings.
- (3) Step Flashing
- Interwoven with each course of shingles, 75mm (3") head lap.
- (4) Final Step flashing
- Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold.
- (5) Backpan Flashing
- The back-pan is to be extended 100mm (4") beyond the corner and folded. Apply caulking at the transition corner of the final step flashing and back pan.
- (6) Capillary Section
- A capillary tab is to be extended off the end of the back pan to lead water around the corner.
- Proprietary soldered or welded diverter flashing may be used provided they conform to RoofStar Guarantee Standards.
NOTE: See the Standard for additional requirements.
Back to Asphalt Shingle System Details
© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.