Difference between revisions of "SBS Metal Edge Termination"
Difference between revisions of "SBS Metal Edge Termination"
(→WORK INCLUDED) |
(→WORK INCLUDED) |
||
| (23 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | { | + | {{Template:RPM Info}} |
| − | + | ||
| − | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
| − | + | __NOTOC__ | |
| − | + | ||
| − | <div class="panel panel- | + | <big><big>Division D - Construction Details</big></big> |
| + | <hr> | ||
| + | <big><big><big><big><big>SBS | Metal Edge Termination ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big> | ||
| + | {{Template:Construction Details Header}} | ||
| + | <div class="panel panel-info"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
<div class="panel-body"> | <div class="panel-body"> | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
| + | <br> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
| − | [[File: | + | [[File:Part 10 - Construction Detail - Metal Edge Termination - SBS.png|class=img-responsive | link=https://rpm.rcabc.org/images/f/f1/Part_10_-_Construction_Detail_-_Metal_Edge_Termination_-_SBS.png]] |
</div> | </div> | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
| − | ;(1 | + | ;(1) [[SBS Roof Systems Standard#PART_9|'''Suitable field substrate''']]: May be the roof deck or deck overlay (if an uninsulated system), or insulation and an overlay (if conventionally insulated). |
| − | + | ;(2) '''Primer or adhesive''': For self-adhered or adhered membranes, as required by the ''manufacturer''. | |
| − | ;(3) [[ | + | ;(3) [[SBS Roof Systems Standard#PART_9|'''Field Base Sheet Membrane''']]: Selected to conform to the requirements in [https://rpm.rcabc.org/index.php?title=SBS_Roof_Systems_Standard#9.2.1.1. Membrane Composition, Thickness, and Selection '''Table 9.2.1.1.'''] and conforming to the options or requirements in a ''Tested Assembly'', an ''Assembly with Proven Past Performance'', or a custom-engineered assembly. Carried continuously over the outside edge and down the vertical face at least 50.8 mm (2”), or 50.8 mm past any cold joint. |
| − | ;( | + | ;(4) '''Sealant or mastic''': Applied to field base sheet membrane, beneath metal edge flashing. |
| − | ;( | + | ;(5) [[SBS Roof Systems Standard#PART_10 | '''Metal edge (flush) flashing''']]: Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows. |
| − | ;( | + | :A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements). |
| + | ;(6) [[SBS Roof Systems Standard#PART_10 | '''Membrane flashing strip''']]: Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the ''manufacturer'' (primer illustrated). | ||
| + | ;(7) [[SBS Roof Systems Standard#PART_9|'''Field Cap Sheet Membrane''']]: Selected to conform to the requirements in [https://rpm.rcabc.org/index.php?title=SBS_Roof_Systems_Standard#9.2.1.1. Membrane Composition, Thickness, and Selection '''Table 9.2.1.1.'''] and conforming to the options or requirements in a ''Tested Assembly'', an ''Assembly with Proven Past Performance'', or a custom-engineered assembly. Installed according to '''Part 9''' requirements. | ||
| + | ;(8) '''Edge mastic''': Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane. Coat with granules. | ||
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
| − | ;(A) | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Supporting (Structural) Roof Deck''']]: Generic and representative only. |
| − | ;(B) Wall | + | ;(B) '''Roof edge substrate''': Wood blocking, required for conventionally insulated roofs. |
| + | ;(C) '''Wall assembly''': Generic and representative only. | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
| − | '''NOTE''': | + | '''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
| − | [[ | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']] |
| − | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
| − | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
Latest revision as of 23:10, 6 November 2025
Division D - Construction Details
SBS | Metal Edge Termination ( Article 10.3.4.2.)
| Notice to Reader | |
| Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. | |
SBS Details
1 WORK INCLUDED
- (1) Suitable field substrate
- May be the roof deck or deck overlay (if an uninsulated system), or insulation and an overlay (if conventionally insulated).
- (2) Primer or adhesive
- For self-adhered or adhered membranes, as required by the manufacturer.
- (3) Field Base Sheet Membrane
- Selected to conform to the requirements in Membrane Composition, Thickness, and Selection Table 9.2.1.1. and conforming to the options or requirements in a Tested Assembly, an Assembly with Proven Past Performance, or a custom-engineered assembly. Carried continuously over the outside edge and down the vertical face at least 50.8 mm (2”), or 50.8 mm past any cold joint.
- (4) Sealant or mastic
- Applied to field base sheet membrane, beneath metal edge flashing.
- (5) Metal edge (flush) flashing
- Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows.
- A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements).
- (6) Membrane flashing strip
- Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the manufacturer (primer illustrated).
- (7) Field Cap Sheet Membrane
- Selected to conform to the requirements in Membrane Composition, Thickness, and Selection Table 9.2.1.1. and conforming to the options or requirements in a Tested Assembly, an Assembly with Proven Past Performance, or a custom-engineered assembly. Installed according to Part 9 requirements.
- (8) Edge mastic
- Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane. Coat with granules.
2 RELATED WORK BY OTHERS
- (A) Supporting (Structural) Roof Deck
- Generic and representative only.
- (B) Roof edge substrate
- Wood blocking, required for conventionally insulated roofs.
- (C) Wall assembly
- Generic and representative only.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.

