Difference between revisions of "SBS Metal Edge Termination"

Jump to: navigation, search

Difference between revisions of "SBS Metal Edge Termination"

(WORK INCLUDED)
 
(9 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
<big><big>Division D - Construction Details</big></big>
 
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
<big><big><big><big><big>SBS 10.3.4.-5 Metal Edge Termination</big></big></big></big></big>
+
<big><big><big><big><big>SBS | Metal Edge Termination ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:Construction Details Header}}
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
+
<div class="panel panel-info">
|-
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[SBS Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
<div class="panel panel-success">
 
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-body">
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div class="col-md-6">
 +
<br>
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:SBS 10.3.5.2 Metal Edge.jpg|class=img-responsive | link=https://rpm.rcabc.org/images/2/2b/SBS_10.3.5.2_Metal_Edge.jpg]]
+
[[File:Part 10 - Construction Detail - Metal Edge Termination - SBS.png|class=img-responsive | link=https://rpm.rcabc.org/images/f/f1/Part_10_-_Construction_Detail_-_Metal_Edge_Termination_-_SBS.png]]
 
</div>
 
</div>
  
::Click below for a printable version of this page (under development)
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=|'''Print Sheet''']]
 
</div>
 
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
  
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) Primer: For self-adhered or torch-applied base membranes, as required by the membrane manufacturer.
+
;(1) [[SBS Roof Systems Standard#PART_9|'''Suitable field substrate''']]: May be the roof deck or deck overlay (if an uninsulated system), or insulation and an overlay (if conventionally insulated).
;(2) [[SBS Roof Systems Standard#PART_9|'''Base Membrane (field)''']]: Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options.  See '''9.3''' for application requirements.
+
;(2) '''Primer or adhesive''': For self-adhered or adhered membranes, as required by the ''manufacturer''.
;(3) [[SBS Roof Systems Standard#PART_10|'''Mastic''']]: Applied beneath metal edge flashing. Refer to '''10.3.5.2''' ('''3''')('''2''').
+
;(3) [[SBS Roof Systems Standard#PART_9|'''Field Base Sheet Membrane''']]: Selected to conform to the requirements in [https://rpm.rcabc.org/index.php?title=SBS_Roof_Systems_Standard#9.2.1.1. Membrane Composition, Thickness, and Selection '''Table 9.2.1.1.'''] and conforming to the options or requirements in a ''Tested Assembly'', an ''Assembly with Proven Past Performance'', or a custom-engineered assembly.  Carried continuously over the outside edge and down the vertical face at least 50.8 mm (2”), or 50.8 mm past any cold joint.
;(4) [[SBS Roof Systems Standard#PART_10|'''Metal Edge Flashing''']]: See '''13.3.2 Fabrication''' for manufacturing requirements. See also '''10.3.1.4 Low Roof Edges''' for application standards and securement.  Hemmed edges are required; a kicked-out drip edge is optional but recommended (cf. '''13.1.2.2''' ('''10''')).
+
;(4) '''Sealant or mastic''': Applied to field base sheet membrane, beneath metal edge flashing.
;(5) [[SBS Roof Systems Standard#PART_10|'''Base Membrane (flashing)''']]: Applied to overlap metal flashing and the field base membrane.
+
;(5) [[SBS Roof Systems Standard#PART_10 | '''Metal edge (flush) flashing''']]: Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows.
;(6) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Installed according to '''Part 9''' standards and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant (cf. '''10.3.5.2''' ('''3''')('''7''')('''2''')).
+
:A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements).
 +
;(6) [[SBS Roof Systems Standard#PART_10 | '''Membrane flashing strip''']]: Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the ''manufacturer'' (primer illustrated).
 +
;(7) [[SBS Roof Systems Standard#PART_9|'''Field Cap Sheet Membrane''']]: Selected to conform to the requirements in [https://rpm.rcabc.org/index.php?title=SBS_Roof_Systems_Standard#9.2.1.1. Membrane Composition, Thickness, and Selection '''Table 9.2.1.1.'''] and conforming to the options or requirements in a ''Tested Assembly'', an ''Assembly with Proven Past Performance'', or a custom-engineered assembly.  Installed according to '''Part 9''' requirements.
 +
;(8) '''Edge mastic''': Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane. Coat with granules.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) Acceptable Substrate: Representative
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Supporting (Structural) Roof Deck''']]: Generic and representative only.
;(B) Wall Assembly: Representative
+
;(B) '''Roof edge substrate''': Wood blocking, required for conventionally insulated roofs.
 +
;(C) '''Wall assembly''': Generic and representative only.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->

Latest revision as of 23:10, 6 November 2025



Division D - Construction Details


SBS | Metal Edge Termination ( Article 10.3.4.2.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details


Part 10 - Construction Detail - Metal Edge Termination - SBS.png

1 WORK INCLUDED

(1) Suitable field substrate
May be the roof deck or deck overlay (if an uninsulated system), or insulation and an overlay (if conventionally insulated).
(2) Primer or adhesive
For self-adhered or adhered membranes, as required by the manufacturer.
(3) Field Base Sheet Membrane
Selected to conform to the requirements in Membrane Composition, Thickness, and Selection Table 9.2.1.1. and conforming to the options or requirements in a Tested Assembly, an Assembly with Proven Past Performance, or a custom-engineered assembly. Carried continuously over the outside edge and down the vertical face at least 50.8 mm (2”), or 50.8 mm past any cold joint.
(4) Sealant or mastic
Applied to field base sheet membrane, beneath metal edge flashing.
(5) Metal edge (flush) flashing
Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows.
A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements).
(6) Membrane flashing strip
Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the manufacturer (primer illustrated).
(7) Field Cap Sheet Membrane
Selected to conform to the requirements in Membrane Composition, Thickness, and Selection Table 9.2.1.1. and conforming to the options or requirements in a Tested Assembly, an Assembly with Proven Past Performance, or a custom-engineered assembly. Installed according to Part 9 requirements.
(8) Edge mastic
Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane. Coat with granules.

2 RELATED WORK BY OTHERS

(A) Supporting (Structural) Roof Deck
Generic and representative only.
(B) Roof edge substrate
Wood blocking, required for conventionally insulated roofs.
(C) Wall assembly
Generic and representative only.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.