Difference between revisions of "SBS Metal Edge Termination"

Jump to: navigation, search

Difference between revisions of "SBS Metal Edge Termination"

(Created page with "File:10.3.2.2.jpg === WORK INCLUDED === (1) <b>Vapor Retarder: </b>If required by design authority (2) <b>Insulation:</b> See list of accepted materials in Section 2.2...")
 
(WORK INCLUDED)
 
(57 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:10.3.2.2.jpg]]
+
{{Template:RPM Info}}
  
=== WORK INCLUDED ===
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
(1) <b>Vapor Retarder:  </b>If required by design authority
+
__NOTOC__
  
(2) <b>Insulation:</b> See list of accepted materials in Section 2.2.
+
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>SBS | Metal Edge Termination ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-info">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<br>
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:Part 10 - Construction Detail - Metal Edge Termination - SBS.png|class=img-responsive | link=https://rpm.rcabc.org/images/f/f1/Part_10_-_Construction_Detail_-_Metal_Edge_Termination_-_SBS.png]]
 +
</div>
  
(3) <b>Insulation Overlay:</b>  Where required. See <i>RGC Guarantee Standard B4.1, B4.2 </i>and<i> C4.1</i>
+
</div><!-- COL-MD-6 -->
  
(4) <b>Primary Membrane and Membrane Protection:</b> Mechanically fasten to outside face of fascia (C).
+
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) [[SBS Roof Systems Standard#PART_9|'''Suitable field substrate''']]: May be the roof deck or deck overlay (if an uninsulated system), or insulation and an overlay (if conventionally insulated).
 +
;(2) '''Primer or adhesive''': For self-adhered or adhered membranes, as required by the ''manufacturer''.
 +
;(3) [[SBS Roof Systems Standard#PART_9|'''Field Base Sheet Membrane''']]: Selected to conform to the requirements in [https://rpm.rcabc.org/index.php?title=SBS_Roof_Systems_Standard#9.2.1.1. Membrane Composition, Thickness, and Selection '''Table 9.2.1.1.'''] and conforming to the options or requirements in a ''Tested Assembly'', an ''Assembly with Proven Past Performance'', or a custom-engineered assembly.  Carried continuously over the outside edge and down the vertical face at least 50.8 mm (2”), or 50.8 mm past any cold joint.
 +
;(4) '''Sealant or mastic''': Applied to field base sheet membrane, beneath metal edge flashing.
 +
;(5) [[SBS Roof Systems Standard#PART_10 | '''Metal edge (flush) flashing''']]: Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows.
 +
:A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements).
 +
;(6) [[SBS Roof Systems Standard#PART_10 | '''Membrane flashing strip''']]: Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the ''manufacturer'' (primer illustrated).
 +
;(7) [[SBS Roof Systems Standard#PART_9|'''Field Cap Sheet Membrane''']]: Selected to conform to the requirements in [https://rpm.rcabc.org/index.php?title=SBS_Roof_Systems_Standard#9.2.1.1. Membrane Composition, Thickness, and Selection '''Table 9.2.1.1.'''] and conforming to the options or requirements in a ''Tested Assembly'', an ''Assembly with Proven Past Performance'', or a custom-engineered assembly.  Installed according to '''Part 9''' requirements.
 +
;(8) '''Edge mastic''': Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane. Coat with granules.
  
(5) <b>Mastic:</b>  Trowel coating of compatible mastic.
+
<hr>
 
 
(6) <b>Metal Edge/Gravel-stop Flashing:</b> Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
 
 
 
(7) <b>Membrane Flashing:</b>  Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m&#178; polyester felt. For flexible membrane systems, refer to manufacturer&#8217;s application details and RGC Guarantee Standards.
 
 
 
(8) <b>Asphalt:</b>  For asphalt and gravel built-up roofing systems only.
 
 
 
(9) <b>Gravel:</b>  For asphalt and gravel built-up roofing systems only.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Supporting (Structural) Roof Deck''']]: Generic and representative only.
 
+
;(B) '''Roof edge substrate''': Wood blocking, required for conventionally insulated roofs.
(B) <b>Wood Blocking</b>
+
;(C) '''Wall assembly''': Generic and representative only.
 
+
</div><!-- COL-6-MD -->
(C) <b>Wood Fascia</b>
+
</div><!-- PANEL BODY -->
 
+
</div><!-- PANEL -->
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
  
 +
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
 
 
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 

Latest revision as of 23:10, 6 November 2025



Division D - Construction Details


SBS | Metal Edge Termination ( Article 10.3.4.2.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details


Part 10 - Construction Detail - Metal Edge Termination - SBS.png

1 WORK INCLUDED

(1) Suitable field substrate
May be the roof deck or deck overlay (if an uninsulated system), or insulation and an overlay (if conventionally insulated).
(2) Primer or adhesive
For self-adhered or adhered membranes, as required by the manufacturer.
(3) Field Base Sheet Membrane
Selected to conform to the requirements in Membrane Composition, Thickness, and Selection Table 9.2.1.1. and conforming to the options or requirements in a Tested Assembly, an Assembly with Proven Past Performance, or a custom-engineered assembly. Carried continuously over the outside edge and down the vertical face at least 50.8 mm (2”), or 50.8 mm past any cold joint.
(4) Sealant or mastic
Applied to field base sheet membrane, beneath metal edge flashing.
(5) Metal edge (flush) flashing
Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows.
A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements).
(6) Membrane flashing strip
Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the manufacturer (primer illustrated).
(7) Field Cap Sheet Membrane
Selected to conform to the requirements in Membrane Composition, Thickness, and Selection Table 9.2.1.1. and conforming to the options or requirements in a Tested Assembly, an Assembly with Proven Past Performance, or a custom-engineered assembly. Installed according to Part 9 requirements.
(8) Edge mastic
Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane. Coat with granules.

2 RELATED WORK BY OTHERS

(A) Supporting (Structural) Roof Deck
Generic and representative only.
(B) Roof edge substrate
Wood blocking, required for conventionally insulated roofs.
(C) Wall assembly
Generic and representative only.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.