Difference between revisions of "TPO Roof System Details"

Jump to: navigation, search

Difference between revisions of "TPO Roof System Details"

(Low-profile Edges ( Article 10.3.4.2.))
(Part 13 - Linear Metal Flashing)
 
(5 intermediate revisions by the same user not shown)
Line 48: Line 48:
 
</li></ol>
 
</li></ol>
  
====='''Parapets''' ([[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])=====
+
====='''Parapets''' ([[TPO_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Parapet (Typical)| Parapet (Typical)]] - Under construction
 
<li>[[TPO Parapet (Typical)| Parapet (Typical)]] - Under construction
Line 56: Line 56:
 
</li></ol>
 
</li></ol>
  
====='''Low-profile Edges''' ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])=====
+
====='''Low-profile Edges''' ([[TPO_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Metal Edge Termination| {{hilite | {{hilite | Metal Edge Termination|| 2021-February-7 }} || 2026-October-31 }}]]
 
<li>[[TPO Metal Edge Termination| {{hilite | {{hilite | Metal Edge Termination|| 2021-February-7 }} || 2026-October-31 }}]]
Line 66: Line 66:
  
 
===Part 10 (continued)===
 
===Part 10 (continued)===
====='''Fire Separations''' ([[EPDM_Roof_Systems_Standard#10.3.4.4._Fire_Separation_Walls | Article 10.3.4.4.]])=====
+
====='''Fire Separations''' ([[TPO_Roof_Systems_Standard#10.3.4.4._Fire_Separation_Walls | Article 10.3.4.4.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Fire Separation Joint |Fire Separation Joint]] - Under construction
 
<li>[[TPO Fire Separation Joint |Fire Separation Joint]] - Under construction
Line 72: Line 72:
 
</li></ol>
 
</li></ol>
  
====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])=====
+
====='''Doors, Windows, and Wall Openings''' ([[TPO_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])=====
 
<ol>
 
<ol>
<li>[[TPO Low Door Opening | {{hilite | Low Door Opening || 2022-February-5 }}]] - Under construction
+
<li>[[TPO Low Door Opening | {{hilite | Low Door Opening || 2026-October-31 }}]]
 
<li>[[TPO Window Opening | Window Opening]] - Under construction
 
<li>[[TPO Window Opening | Window Opening]] - Under construction
 
</li></ol>
 
</li></ol>
  
====='''Expansion Joints''' ([[EPDM_Roof_Systems_Standard#10.3.6.1._Expansion_Joints | Article 10.3.6.1.]])=====
+
====='''Expansion Joints''' ([[TPO_Roof_Systems_Standard#10.3.6.1._Expansion_Joints | Article 10.3.6.1.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Expansion Joint (Wall) | Expansion Joint (Wall)]] - Under construction
 
<li>[[TPO Expansion Joint (Wall) | Expansion Joint (Wall)]] - Under construction
Line 84: Line 84:
 
</li></ol>
 
</li></ol>
  
====='''Control Joints (Roof Dividers)''' ([[EPDM_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])=====
+
====='''Control Joints (Roof Dividers)''' ([[TPO_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])=====
 
<ol>
 
<ol>
<li>[[TPO Control Joint (Roof Divider)| Control Joint (Roof Divider)]] - Under construction
+
<li>[[TPO Control Joint (Roof Divider)| {{hilite | Control Joint (Roof Divider) || 2026-October-31 }}]]
 
</li></ol>
 
</li></ol>
  
 
===Part 11 - Drainage===
 
===Part 11 - Drainage===
  
====='''Cast-iron Roof Drains''' ([[EPDM_Roof_Systems_Standard#11.3.3.2._General_Requirements_for_Cast-iron_Roof_Drains | Article 11.3.3.2.]])=====
+
====='''Cast-iron Roof Drains''' ([[TPO_Roof_Systems_Standard#11.3.3.2._General_Requirements_for_Cast-iron_Roof_Drains | Article 11.3.3.2.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Cast Iron Drains| Cast Iron Drains]] - Under construction
 
<li>[[TPO Cast Iron Drains| Cast Iron Drains]] - Under construction
 
</li></ol>
 
</li></ol>
  
====='''Flanged Insert-type Roof Drains''' ([[EPDM_Roof_Systems_Standard#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])=====
+
====='''Flanged Insert-type Roof Drains''' ([[TPO_Roof_Systems_Standard#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Flanged Insert Drain| Flanged Insert Drain]] - Under construction
 
<li>[[TPO Flanged Insert Drain| Flanged Insert Drain]] - Under construction
Line 102: Line 102:
 
</li></ol>
 
</li></ol>
  
====='''Scuppers and Overflows''' ([[EPDM_Roof_Systems_Standard#11.3.3.7._Scuppers_and_Overflows | Article 11.3.3.7.]])=====
+
====='''Scuppers and Overflows''' ([[TPO_Roof_Systems_Standard#11.3.3.7._Scuppers_and_Overflows | Article 11.3.3.7.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Open-wall Scupper Drain | Open-wall Scupper Drain ]] - Under construction
 
<li>[[TPO Open-wall Scupper Drain | Open-wall Scupper Drain ]] - Under construction
Line 114: Line 114:
 
===Part 12 - Penetrations and Curbs===
 
===Part 12 - Penetrations and Curbs===
  
====='''Flashing Penetrations''' ([[EPDM_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])=====
+
====='''Flashing Penetrations''' ([[TPO_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])=====
 
<ol>
 
<ol>
<li>[[TPO Plumbing Vent (Conventional Roof System)| Plumbing Vent (Conventional Roof System)]] - Under construction
+
<li>[[TPO Plumbing Vent (Conventional Roof System)| {{hilite | Plumbing Vent (Conventional Roof System) || 2026-October-31 }}]]
 
<li>[[TPO 2-Part Retrofit Flashing (Cable Penetration) | 2-Part Retrofit Flashing (Cable Penetration)]] - Under construction
 
<li>[[TPO 2-Part Retrofit Flashing (Cable Penetration) | 2-Part Retrofit Flashing (Cable Penetration)]] - Under construction
 
<li>[[TPO Fall Protection Anchor in Roof | Fall Protection Anchor in Roof]] - Under construction
 
<li>[[TPO Fall Protection Anchor in Roof | Fall Protection Anchor in Roof]] - Under construction
Line 123: Line 123:
 
</li></ol>
 
</li></ol>
  
====='''Curbs, Sleepers, and Equipment Pads''' ([[EPDM_Roof_Systems_Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])=====
+
====='''Curbs, Sleepers, and Equipment Pads''' ([[TPO_Roof_Systems_Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Basic Curb| {{hilite | Basic Curb || 2021-February-7 }}]] - Under construction
 
<li>[[TPO Basic Curb| {{hilite | Basic Curb || 2021-February-7 }}]] - Under construction
Line 131: Line 131:
 
</li></ol>
 
</li></ol>
  
====='''Railings, Ladders, and Other Attached Structures''' ([[EPDM_Roof_Systems_Standard#12.3.2.7._Railings.2C_Ladders.2C_and_Other_Attached_Structures | Article 12.3.2.7.]])=====
+
====='''Railings, Ladders, and Other Attached Structures''' ([[TPO_Roof_Systems_Standard#12.3.2.7._Railings.2C_Ladders.2C_and_Other_Attached_Structures | Article 12.3.2.7.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Railing | Railing]] - Under construction
 
<li>[[TPO Railing | Railing]] - Under construction
 
</li></ol>
 
</li></ol>
  
====='''Sealant Pockets''' ([[SBS_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])=====
+
====='''Sealant Pockets''' ([[TPO_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])=====
 
<ol>
 
<ol>
 
<li>[[TPO Sealant Pocket| Sealant Pocket]] - Under construction
 
<li>[[TPO Sealant Pocket| Sealant Pocket]] - Under construction
Line 142: Line 142:
  
 
===Part 13 - Linear Metal Flashing===
 
===Part 13 - Linear Metal Flashing===
:See the separate page, [[Linear_Metal_Flashing_Details | Construction Details for Linear Metal Flashings]].
+
:[[LMF Metal Cap Flashing (joints) | Metal Cap Flashing (joints)]]
 +
:[[LMF Metal Cap Flashing (inside corner) | Metal Cap Flashing (inside corner)]]
 +
:[[LMF Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed) | Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)]]
 +
 
 +
:[[TPO Metal Butt Joint | {{hilite | Metal Butt Joint || 2026-October-31 }}]]
 +
 
 +
:'''NOTE''': The following pages are currently under construction
 +
 
 +
:[[LMF 13.3.1-4 Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed) | Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed)]]
  
 
===Part 14 - The Roof as a Platform===
 
===Part 14 - The Roof as a Platform===

Latest revision as of 22:14, 12 November 2025



Division D - Construction Details

Construction Details for TPO Membrane Roof Systems
TPO project (courtesy Carlisle Syntec).jpg
The drawings linked on this page are intended to represent a variety of TPO Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about TPO Membrane System designs and requirements, see the Standard for TPO Membrane Roof Systems.

Part 10 (continued)

Fire Separations ( Article 10.3.4.4.)
  1. Fire Separation Joint - Under construction
  2. Fire Separation Wall - Under construction
Doors, Windows, and Wall Openings ( Article 10.3.4.5.)
  1. Low Door Opening
  2. Window Opening - Under construction
Expansion Joints ( Article 10.3.6.1.)
  1. Expansion Joint (Wall) - Under construction
  2. Expansion Joint (Field) - Under construction
Control Joints (Roof Dividers) ( Article 10.3.6.2.)
  1. Control Joint (Roof Divider)

Part 11 - Drainage

Cast-iron Roof Drains ( Article 11.3.3.2.)
  1. Cast Iron Drains - Under construction
Flanged Insert-type Roof Drains ( Article 11.3.3.6.)
  1. Flanged Insert Drain - Under construction
  2. Flanged Insert Drain (Clamping Ring) - Under construction
Scuppers and Overflows ( Article 11.3.3.7.)
  1. Open-wall Scupper Drain - Under construction
  2. Through-wall Scupper Drain - Under construction

Part 12 - Penetrations and Curbs

Flashing Penetrations ( Article 12.3.2.1.)
  1. Plumbing Vent (Conventional Roof System)
  2. 2-Part Retrofit Flashing (Cable Penetration) - Under construction
  3. Fall Protection Anchor in Roof - Under construction
  4. Fall Protection Anchor in Wall - Under construction
  5. Fall Protection Anchor in Wall (Protected Roof System) - Under construction
Curbs, Sleepers, and Equipment Pads ( Article 12.3.2.4.)
  1. Basic Curb - Under construction
  2. Curb for Multiple Penetrations - Under construction
  3. Mechanical Equipment Curb - Under construction
  4. Equipment Sleeper - Under construction
Railings, Ladders, and Other Attached Structures ( Article 12.3.2.7.)
  1. Railing - Under construction
Sealant Pockets ( Article 12.3.2.8.)
  1. Sealant Pocket - Under construction

Part 13 - Linear Metal Flashing

Metal Cap Flashing (joints)
Metal Cap Flashing (inside corner)
Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)
Metal Butt Joint
NOTE: The following pages are currently under construction
Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed)

Part 14 - The Roof as a Platform


Standard for TPO Membrane Roof Systems

Home

© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.