Difference between revisions of "SBS Canted Edge"
Difference between revisions of "SBS Canted Edge"
(→WORK INCLUDED) |
(→WORK INCLUDED) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
[[File:SBS 10.3.5.3 Cant Edge (2).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/9/91/SBS_10.3.5.3_Cant_Edge_%282%29.jpg]] | [[File:SBS 10.3.5.3 Cant Edge (2).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/9/91/SBS_10.3.5.3_Cant_Edge_%282%29.jpg]] | ||
</div> | </div> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 30: | Line 23: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layer''']]: Installed following the requirements of '''Part 6''' in this Standard. Tie in the control layers with membranes installed by other trades, to preserve continuity of the building enclosure ('''1a'''). | ;(1) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layer''']]: Installed following the requirements of '''Part 6''' in this Standard. Tie in the control layers with membranes installed by other trades, to preserve continuity of the building enclosure ('''1a'''). | ||
− | ;(2) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Installed in staggered and offset layers (not illustrated), and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on '''Part 3''' of the '''''RoofStar Guarantee | + | ;(2) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Installed in staggered and offset layers (not illustrated), and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on '''Part 3''' of the '''''RoofStar Guarantee''''' Standard for the membrane system type. |
;(3) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Subject to the requirements of Part 8 in the Standard. | ;(3) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Subject to the requirements of Part 8 in the Standard. | ||
;(4) [[SBS Roof Systems Standard#PART_9|'''Base Membrane (field)''']]: Mechanically attached, torch-applied, adhered or self-adhered. See Table 9.1. in [[SBS Roof Systems Standard#9.2.1.1. Membrane Composition, Thickness, and Selection | Article 9.2.1.1.]] for acceptable membrane types and securement options. See [[SBS Roof Systems Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]] for application requirements. | ;(4) [[SBS Roof Systems Standard#PART_9|'''Base Membrane (field)''']]: Mechanically attached, torch-applied, adhered or self-adhered. See Table 9.1. in [[SBS Roof Systems Standard#9.2.1.1. Membrane Composition, Thickness, and Selection | Article 9.2.1.1.]] for acceptable membrane types and securement options. See [[SBS Roof Systems Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]] for application requirements. | ||
− | ;(5) [[SBS Roof Systems Standard#PART_10|'''Base Membrane (flashing)''']]: Carried | + | ;(5) [[SBS Roof Systems Standard#PART_10|'''Base Membrane (flashing)''']]: Carried over the canted edge and down the outside face at least 50.8 mm (2"). Prime substrate, as required by the membrane manufacturer. |
;(6) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Granule-surfaced membrane. | ;(6) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Granule-surfaced membrane. | ||
;(7) [[SBS Roof Systems Standard#PART_10|'''Cap Membrane (flashing)''']]: Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge. | ;(7) [[SBS Roof Systems Standard#PART_10|'''Cap Membrane (flashing)''']]: Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge. |
Latest revision as of 18:03, 25 July 2024
Division D - Construction Details
SBS | Canted Edge ( Article 10.3.4.2.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Air or Vapour Control Layer
- Installed following the requirements of Part 6 in this Standard. Tie in the control layers with membranes installed by other trades, to preserve continuity of the building enclosure (1a).
- (2) Insulation
- Installed in staggered and offset layers (not illustrated), and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on Part 3 of the RoofStar Guarantee Standard for the membrane system type.
- (3) Insulation Overlay
- Subject to the requirements of Part 8 in the Standard.
- (4) Base Membrane (field)
- Mechanically attached, torch-applied, adhered or self-adhered. See Table 9.1. in Article 9.2.1.1. for acceptable membrane types and securement options. See Article 10.3.4.2. for application requirements.
- (5) Base Membrane (flashing)
- Carried over the canted edge and down the outside face at least 50.8 mm (2"). Prime substrate, as required by the membrane manufacturer.
- (6) Cap Membrane (field)
- Granule-surfaced membrane.
- (7) Cap Membrane (flashing)
- Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge.
- (8) Metal Cant Flashing
- Secure metal flashings with appropriate fasteners set at least 87 mm (3 ½”) above the finished roof surface. Alternatively, secure flashing from the outside face (illustrated).
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Cant and Fascia Woodwork
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.