Difference between revisions of "TPO Protected Roof Assembly (Typical)"
Difference between revisions of "TPO Protected Roof Assembly (Typical)"
(Created page with "File:6.3.3.1.jpg === WORK INCLUDED === (1) <b>Protection Mat:</b> Provide protection between concrete deck and membrane with installation of manufacturer specified and...") |
|||
(17 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | {{Template:RPM Info}} | |
+ | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
+ | __NOTOC__ | ||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>TPO | Protected Membrane Roof Assembly (Typical) ([[TPO_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''TPO Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:6.3.3.1.jpg| link=http://rpm.rcabc.org/images/4/4e/6.3.3.1.jpg | class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
+ | ;(1) [[TPO Roof Systems Standard#PART_9|'''Protection Mat''']]: Provide protection between concrete deck and membrane with installation of manufacturer specified and RGC accepted protection mat or deck overlay boards. | ||
+ | ;(2) [[TPO Roof Systems Standard#PART_9|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''. | ||
+ | ;(3) [[TPO Roof Systems Standard#PART_9|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed. | ||
+ | ;(4) '''Membrane Lap''': EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive. | ||
+ | ;(5) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). May vary from drawing. | ||
+ | ;(6) [[TPO Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Adhered to primary membrane. | ||
+ | ;(7) [[TPO Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Division C | Division C]] of this Manual. | ||
+ | ;(8) [[TPO Roof Systems Standard#PART_14|'''Filter Fabric''']]: Metal base flashing required. | ||
+ | ;(9) [[TPO Roof Systems Standard#PART_13|'''Metal Flashing''']]: As required by ''RoofStar Guarantee Standards''. | ||
+ | ;(10) [[TPO Roof Systems Standard#PART_3|'''Ballast''']]: Gravel or concrete paving tiles. | ||
+ | ;(11) [[TPO Roof Systems Standard#PART_13|'''Parapet Flashing''']]: As required by ''RoofStar Guarantee Standards''. | ||
− | + | <hr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
+ | ;(A) [[TPO Roof Systems Standard#PART_2|'''Acceptable Deck''']] | ||
+ | ;(B) [[TPO Roof Systems Standard#PART_10|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer. | ||
+ | ;(C) [[TPO Roof Systems Standard#PART_13|'''Sloped Wood Blocking''']] | ||
+ | </div><!-- COL-6-MD --> | ||
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
− | + | '''NOTE''': See the [[TPO Roof Systems Standard | '''Standard''']] for additional requirements. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ''' | ||
− | |||
<hr> | <hr> | ||
+ | [[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Construction Details'']] | ||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 21:34, 27 June 2022
Division D - Construction Details
TPO | Protected Membrane Roof Assembly (Typical) ( Article 1.1.3.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
TPO Details
1 WORK INCLUDED
- (1) Protection Mat
- Provide protection between concrete deck and membrane with installation of manufacturer specified and RGC accepted protection mat or deck overlay boards.
- (2) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (3) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (4) Membrane Lap
- EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
- (5) Fasteners
- Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). May vary from drawing.
- (6) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Adhered to primary membrane.
- (7) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Division C of this Manual.
- (8) Filter Fabric
- Metal base flashing required.
- (9) Metal Flashing
- As required by RoofStar Guarantee Standards.
- (10) Ballast
- Gravel or concrete paving tiles.
- (11) Parapet Flashing
- As required by RoofStar Guarantee Standards.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Sloped Wood Blocking
NOTE: See the Standard for additional requirements.
Back to TPO Construction Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.