Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"

Jump to: navigation, search

Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"

Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
 
+
<hr>
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 +
|-
 +
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[ASM Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
Line 19: Line 21:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMOVERLAYS|'''Deck overlay''']]: Required for continuous support of the underlayment when the deck is not suitable.
+
;(1) [[ASM Roof Systems Standard#ASMOVERLAYS|'''Deck overlay''']]: Required for continuous support of the underlayment when the deck is not suitable.
;(2) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
+
;(2) [[ASM Roof Systems Standard#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMINSULALIGNMENT|'''Insulation''']]: Offset and stagger layers 300 mm (12").
+
;(3) [[ASM Roof Systems Standard#ASMINSULALIGNMENT|'''Insulation''']]: Offset and stagger layers 300 mm (12").
;(4) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSEP-VENT|'''Vapour-permeable separation membrane''']]: Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems.  The material must be located between the insulation and metal panels/ventilation material (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
+
;(4) [[ASM Roof Systems Standard#ASMSEP-VENT|'''Vapour-permeable separation membrane''']]: Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems.  The material must be located between the insulation and metal panels/ventilation material (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
;(5) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSLIP|'''Ventilation layer''']]: A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
+
;(5) [[ASM Roof Systems Standard#ASMSLIP|'''Ventilation layer''']]: A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
;(6) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMINSULLAYERING|'''Bearing plate''']]: Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
+
;(6) [[ASM Roof Systems Standard#ASMINSULLAYERING|'''Bearing plate''']]: Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
;(7) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMCLIP |'''Architectural metal panel clip''']]
+
;(7) [[ASM Roof Systems Standard#ASMCLIP |'''Architectural metal panel clip''']]
;(8) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
+
;(8) [[ASM Roof Systems Standard#ASMPANEL |'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
 
;(9) Overlap area of lower panel: Penetration flashing is mounted here, set in an acceptable sealant.
 
;(9) Overlap area of lower panel: Penetration flashing is mounted here, set in an acceptable sealant.
 
;(10) '''Spaced Cleat''': Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.  
 
;(10) '''Spaced Cleat''': Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.  
;(11) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEALANT |'''Sealant''']]
+
;(11) [[ASM Roof Systems Standard#ASMSEALANT |'''Sealant''']]
 
;(12) '''Architectural metal roof panel (upper)''': Installed after penetration flashing.  Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
 
;(12) '''Architectural metal roof panel (upper)''': Installed after penetration flashing.  Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
 
;(13) '''Protrusion Flashing''':  Flange set in two continuous beads of accepted caulking.
 
;(13) '''Protrusion Flashing''':  Flange set in two continuous beads of accepted caulking.
;(14) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEALANT |'''Sealant''']]: Applied around base of penetration flashing.
+
;(14) [[ASM Roof Systems Standard#ASMSEALANT |'''Sealant''']]: Applied around base of penetration flashing.
 
;(15) '''Settlement Cap''': Material must match flashing material.  
 
;(15) '''Settlement Cap''': Material must match flashing material.  
  
Line 38: Line 40:
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMDECK|'''Acceptable Deck''']]
+
;(A) [[ASM Roof Systems Standard#ASMDECK|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']]
  
[[RoofStar Guarantee Standards for ASM Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Assemblies]]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 14:42, 31 August 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
ASM Details

ASM 11.1.2 Pipe Flashing, Split Panel.jpg

Print Sheet Under Revision

1 WORK INCLUDED

(1) Deck overlay
Required for continuous support of the underlayment when the deck is not suitable.
(2) Underlayment
The type of underlay required is determined by roof slope.
(3) Insulation
Offset and stagger layers 300 mm (12").
(4) Vapour-permeable separation membrane
Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels/ventilation material (see 8.1.2 Design).
(5) Ventilation layer
A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
(6) Bearing plate
Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
(7) Architectural metal panel clip
(8) Architectural metal roof panel (lower)
Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
(9) Overlap area of lower panel
Penetration flashing is mounted here, set in an acceptable sealant.
(10) Spaced Cleat
Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.
(11) Sealant
(12) Architectural metal roof panel (upper)
Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
(13) Protrusion Flashing
Flange set in two continuous beads of accepted caulking.
(14) Sealant
Applied around base of penetration flashing.
(15) Settlement Cap
Material must match flashing material.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.