Difference between revisions of "ASM Eave and Rake Edges (Zinc)"

Jump to: navigation, search

Difference between revisions of "ASM Eave and Rake Edges (Zinc)"

Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
 
+
<hr>
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
|-
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and <u>not intended in their representation of an assembly to be prescriptive</u>.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the '''RoofStar Guarantee Standards''' for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of applicable '''''RoofStar Guarantee Standards''''' may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
+
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[ASM Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
|}
 +
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
Line 24: Line 25:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMHOOKSTRIP | '''Separation membrane''']]: Separates the deck and the metal edge flashing.
+
;(1) [[ASM Roof Systems Standard#ASMHOOKSTRIP | '''Separation membrane''']]: Separates the deck and the metal edge flashing.
;(2) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMFLASH-SECURE | '''Hook securement strip''']]: In this particular rake edge configuration, a similar strip is installed along the rake to secure the flush rake-edge flashing.
+
;(2) [[ASM Roof Systems Standard#ASMFLASH-SECURE | '''Hook securement strip''']]: In this particular rake edge configuration, a similar strip is installed along the rake to secure the flush rake-edge flashing.
;(3) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMHOOKSTRIP | '''Continuous eave metal flashing''']]:
+
;(3) [[ASM Roof Systems Standard#ASMHOOKSTRIP | '''Continuous eave metal flashing''']]:
;(4) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMUNDERLAYMENT|'''Eave protection''']]: One ply of self-adhered modified bituminous underlayment material. Lap 50 mm (2") minimum on sides and 100 mm (4") minimum on ends.
+
;(4) [[ASM Roof Systems Standard#ASMUNDERLAYMENT|'''Eave protection''']]: One ply of self-adhered modified bituminous underlayment material. Lap 50 mm (2") minimum on sides and 100 mm (4") minimum on ends.
;(5) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMUNDERLAYMENT|'''Underlayment''']]: Applicable for all Architectural Sheet Metal systems.  For slopes less than 1:3, the entire roof slope must be covered with a <u>self-adhered</u> underlayment.
+
;(5) [[ASM Roof Systems Standard#ASMUNDERLAYMENT|'''Underlayment''']]: Applicable for all Architectural Sheet Metal systems.  For slopes less than 1:3, the entire roof slope must be covered with a <u>self-adhered</u> underlayment.
;(6) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEP-VENT|'''Ventilation material''']]: A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
+
;(6) [[ASM Roof Systems Standard#ASMSEP-VENT|'''Ventilation material''']]: A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
;(7) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMCLIP|'''Metal panel clip''']]: Installed in keeping with the metal roof panel manufacturer's printed instructions. Install on EPDM pad (not shown) or use a tall clip sized to support the panel on top of the ventilation layer.
+
;(7) [[ASM Roof Systems Standard#ASMCLIP|'''Metal panel clip''']]: Installed in keeping with the metal roof panel manufacturer's printed instructions. Install on EPDM pad (not shown) or use a tall clip sized to support the panel on top of the ventilation layer.
;(8) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMHOOKSTRIP | '''Flush rake-edge flashing''']]: Note that panel hooks onto outside edge of flashing, which is mechanically secured to the roof deck.
+
;(8) [[ASM Roof Systems Standard#ASMHOOKSTRIP | '''Flush rake-edge flashing''']]: Note that panel hooks onto outside edge of flashing, which is mechanically secured to the roof deck.
;(9) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMPANEL |'''Architectural metal roof panel''']]
+
;(9) [[ASM Roof Systems Standard#ASMPANEL |'''Architectural metal roof panel''']]
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMDECK|'''Acceptable deck''']]
+
;(A) [[ASM Roof Systems Standard#ASMDECK|'''Acceptable deck''']]
 
;(B) '''Fascia Board'''  
 
;(B) '''Fascia Board'''  
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
Line 43: Line 44:
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
[[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems|<i class="fa fa-chevron-circle-right fa" ></i> RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems]]
+
[[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']]
 +
 
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 14:27, 31 August 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

ASM 10.1.4 Eave and Rake Flashing (Zinc).jpg


Click below for a printable version of this page (N/A)
Print Sheet

1 WORK INCLUDED

(1) Separation membrane
Separates the deck and the metal edge flashing.
(2) Hook securement strip
In this particular rake edge configuration, a similar strip is installed along the rake to secure the flush rake-edge flashing.
(3) Continuous eave metal flashing
(4) Eave protection
One ply of self-adhered modified bituminous underlayment material. Lap 50 mm (2") minimum on sides and 100 mm (4") minimum on ends.
(5) Underlayment
Applicable for all Architectural Sheet Metal systems. For slopes less than 1:3, the entire roof slope must be covered with a self-adhered underlayment.
(6) Ventilation material
A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
(7) Metal panel clip
Installed in keeping with the metal roof panel manufacturer's printed instructions. Install on EPDM pad (not shown) or use a tall clip sized to support the panel on top of the ventilation layer.
(8) Flush rake-edge flashing
Note that panel hooks onto outside edge of flashing, which is mechanically secured to the roof deck.
(9) Architectural metal roof panel

2 RELATED WORK BY OTHERS

(A) Acceptable deck
(B) Fascia Board

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.