Difference between revisions of "ASM Valley (Unhooked)"

Jump to: navigation, search

Difference between revisions of "ASM Valley (Unhooked)"

(RELATED WORK BY OTHERS)
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
<hr>
+
{{Template:RPM Info}}
[[File:8.1.4.6.1.jpg]]
 
  
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
  
=== WORK INCLUDED ===
+
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>ASM | Valley (Unhooked) ([[ASM_Roof_Systems_Standard#10.3.5.2. General Requirements for Valley Metal Flashing | Article 10.3.2.2.]] and [[ASM_Roof_Systems_Standard#10.3.5.4. Unhooked Metal Valleys | Article 10.3.5.4.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:ASM 10.3.2 Unhooked Valley Flashing.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/e/e3/ASM_10.3.2_Unhooked_Valley_Flashing.jpg]]
 +
</div>
  
(1) <b>Valley Protection Membrane</b>: Accepted self-adhered modified bituminous eave protection membrane.
+
::Click below for a printable version of this page (N/A)
  
(2) <b>Underlayment</b>: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).  
+
<div style="width:150px; text-align: left;">
 +
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/5/52/D1.7.6-3_Print_Sheet.pdf|'''Print Sheet''']]
 +
</div>
  
(3) <b>Slip Sheet</b>: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
 
  
(4) <b>Valley Metal Panel</b>: Preformed with centre rib.
+
</div><!-- COL-MD-6 -->
  
(5) <b>Metal Clip</b>: Installed to metal roof panel manufacturer&#8217;s printed instructions.  
+
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) [[ASM Roof Systems Standard#8.1.3.2. Valley Protection |'''Valley protection membrane''']]: Accepted self-adhered modified bituminous eave protection membrane.
 +
;(2) [[ASM Roof Systems Standard#10.1.5.2. Valley Flashing |'''Valley Metal Panel''']]: Preformed with centre rib.
 +
;(3) [[ASM Roof Systems Standard#9.2.1.5.Clips|'''Metal panel clip''']]: Installed to metal roof panel manufacturer's printed instructions.  
 +
;(4) [[ASM Roof Systems Standard#10.3.5.2. General Requirements for Valley Metal Flashing |'''Valley panel overlap''']]: Overlaps minimum 200 mm (8") sealed with two rows of acceptable sealant or butyl tape, and secured with drag load fasteners.
 +
;(5) [[ASM Roof Systems Standard#10.3.5.2. General Requirements for Valley Metal Flashing|'''Membrane flashing''']]: Accepted self-adhered modified bituminous eave protection membrane.
 +
;(6) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment''']]: The type of underlay required is determined by roof slope.
 +
;(7) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventilation beneath panels''']]:  A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
 +
;(8) [[ASM Roof Systems Standard#10.3.5.4. Unhooked Metal Valleys| '''Sealant or pre-formed closures''']]: Required at the bottom ends of panels.
 +
;(9) [[ASM Roof Systems Standard#PART_9 |'''Architectural metal roof panel''']]
  
(6) <b>Pre-Formed Closures</b>: Two rows set in accepted caulking.
+
<hr>
 
 
(7) <b>Architectural Metal Roof Panel</b>
 
 
 
(8) <b>Valley Panel Overlap: </b>Overlaps minimum 200 mm (8") sealed with two rows of accepted caulking and drag load fasteners.
 
 
 
 
 
=== RELATED WORK BY OTHERS  ===
 
 
 
(A) <b>Acceptable Deck</b>  
 
  
 +
=== RELATED WORK BY OTHERS ===
 +
;(A) [[ASM Roof Systems Standard#PART_2|'''Acceptable Deck''']]
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
'''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements.
 
 
  
 
<hr>
 
<hr>
  
 +
[[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Application'']]
 
 
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 

Latest revision as of 18:24, 28 June 2022



Division D - Construction Details


ASM | Valley (Unhooked) ( Article 10.3.2.2. and Article 10.3.5.4.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

ASM 10.3.2 Unhooked Valley Flashing.jpg

Click below for a printable version of this page (N/A)
Print Sheet


1 WORK INCLUDED

(1) Valley protection membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Valley Metal Panel
Preformed with centre rib.
(3) Metal panel clip
Installed to metal roof panel manufacturer's printed instructions.
(4) Valley panel overlap
Overlaps minimum 200 mm (8") sealed with two rows of acceptable sealant or butyl tape, and secured with drag load fasteners.
(5) Membrane flashing
Accepted self-adhered modified bituminous eave protection membrane.
(6) Underlayment
The type of underlay required is determined by roof slope.
(7) Ventilation beneath panels
A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
(8) Sealant or pre-formed closures
Required at the bottom ends of panels.
(9) Architectural metal roof panel

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.