Difference between revisions of "Asphalt Shingles - Valley Intersection with Ridge"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Valley Intersection with Ridge"

Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
 +
<big><big><big><big><big>ASh 10.5.1 Valley Transition (Upper)</big></big></big></big></big>
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>

Revision as of 20:58, 7 September 2021



Division D - Construction Details


ASh 10.5.1 Valley Transition (Upper)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
Asphalt Shingle Details
Click on any image to expand it
ASh 10.5.1-1 CD.jpg ASh 10.5.1-2 CD.jpg
ASh 10.5.1-3 CD.jpg ASh 10.5.1-4 CD.jpg

1 WORK INCLUDED

(1) Valley Protection Membrane
Applied beneath the metal valley flashing.
(2) Valley Metal Flashing
Required for open valleys.
(3) Underlayment
Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
(4) Lower Membrane Patch
Required to cover the joint where the ridgeline of one roof joins the sloped plane of another. Cut as illustrated and apply to the slope; the patch must be cut large enough to extend upslope at least 150 mm (6”), but must not exceed the exposure of the ridge cap shingles.
(5) Upper Membrane Patch
Required to overlap the Lower Membrane Patch, ‘shingle-style’, by at least 50 mm (2”). Extend the patch upslope past the Metal Valley Flashing at least 150 mm (6”).
(6) Shingles (field)
(7) Shingle Ridge Cap
(8) Split Ridge Cap Shingle Transition
Required to tie the ridge caps into the adjacent roof field shingles.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to Asphalt Shingle System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.