Difference between revisions of "CSA Tested Assemblies Draft 3"

Jump to: navigation, search

Difference between revisions of "CSA Tested Assemblies Draft 3"

 
Line 11: Line 11:
 
<big><big>Table Structure and Organization</big></big>
 
<big><big>Table Structure and Organization</big></big>
  
The tables on the adjacent tabs display data drawn from, and links to, '''Tested Assembly Reports''' listed by the membrane type shown on the tab heading.  Dynamic Wind Uplift (DUR) values are shown in columns near the left side of the tables.  Only the DUR and Manufacturer columns are sortable; to sort a column, click the column heading.
+
The tables on the adjacent tabs display data drawn from, and links to, '''Tested Assembly Reports''' listed by the membrane type shown on the tab heading.  All test reports are downloadable from the "Test Report" column, and are catalogued under a RoofStar numbering system that may differ from the number designation on the report.  Dynamic Wind Uplift (DUR) values are shown in columns near the left side of the tables.  Only the DUR and Manufacturer columns are sortable; to sort a column, click the column heading.
 
<span style="color:#FF0000"> '''Click on any drop-down button to try the demo table below.'''</span>
 
<span style="color:#FF0000"> '''Click on any drop-down button to try the demo table below.'''</span>
 
<table class="table">
 
<table class="table">
 
{| class="wikitable sortable"  style="margin-left: 20pt; margin-right: auto; border-color:#E7E9E9;"
 
{| class="wikitable sortable"  style="margin-left: 20pt; margin-right: auto; border-color:#E7E9E9;"
! colspan="5" rowspan="1"; style="vertical-align:center;text-align:center; background-color:#54595d" | <span style="color:#fff">Tested Assembly Report Data</span>
+
! colspan="5" rowspan="1"; style="vertical-align:center;text-align:center; background-color:#4682b4" | <span style="color:#fff">Tested Assembly Report Data</span>
! colspan="1" rowspan="1"; style="vertical-align:center;text-align:center; background-color:#B22222" | <span style="color:#fff">RoofStar<br>Guarantee</span>
 
 
! colspan="3" rowspan="1"; style="vertical-align:center;text-align:center; background-color:#808080" | <span style="color:#fff">Primary Materials</span>
 
! colspan="3" rowspan="1"; style="vertical-align:center;text-align:center; background-color:#808080" | <span style="color:#fff">Primary Materials</span>
 
! colspan="4" rowspan="1"; style="vertical-align:center;text-align:center; background-color:#A9A9A9" | <span style="color:#fff">Other System Materials & Deck</span>
 
! colspan="4" rowspan="1"; style="vertical-align:center;text-align:center; background-color:#A9A9A9" | <span style="color:#fff">Other System Materials & Deck</span>
Line 23: Line 22:
 
! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic Uplift Resistance
 
! colspan="2" rowspan="1" style="vertical-align:top;background-color:#c8ccd1" | Dynamic Uplift Resistance
 
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Roof<br>Assembly<br>Summary
 
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Roof<br>Assembly<br>Summary
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Test Report
+
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Test Report
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Term<sup>†</sup>
 
 
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Cap<br>Membrane
 
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Cap<br>Membrane
 
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Base<br>Membrane
 
! class="unsortable" colspan="1" rowspan="2" style="vertical-align:center;text-align:center;" | Base<br>Membrane
Line 40: Line 38:
 
| style="vertical-align:center;text-align:center;" | <b> -40 </b>
 
| style="vertical-align:center;text-align:center;" | <b> -40 </b>
 
| <html><!-- Single button --><div class="btn-group"><button type="button" class="btn btn-warning dropdown-toggle" data-toggle="dropdown" aria-haspopup="true" aria-expanded="false">View summary<span class="caret"></span></button><ul class="dropdown-menu"> <li><a href="#"><b>EXAMPLE ONLY</b></a></li><li><a href="#"><b>Cap membrane</b>: application/securement method</a></li><li><a href="#"><b>Base membrane</b>: mechanically fastened</a></li><li><a href="#"><b>Insulation overlay</b>: (optional) various securement options</a></li><li><a href="#"><b>Insulation (top layer)</b>: mechanically fastened</a></li></li><li><a href="#"><b>Insulation (bottom layer)</b>: N/A</a></li><li><a href="#"><b>Air/Vapour control layer</b>: various securement options</a></li><li><a href="#"><b>Deck overlay (thermal barrier)</b>: various securement options</a></li><li><a href="#"><b>Roof deck</b></a></li> </ul></div></html>
 
| <html><!-- Single button --><div class="btn-group"><button type="button" class="btn btn-warning dropdown-toggle" data-toggle="dropdown" aria-haspopup="true" aria-expanded="false">View summary<span class="caret"></span></button><ul class="dropdown-menu"> <li><a href="#"><b>EXAMPLE ONLY</b></a></li><li><a href="#"><b>Cap membrane</b>: application/securement method</a></li><li><a href="#"><b>Base membrane</b>: mechanically fastened</a></li><li><a href="#"><b>Insulation overlay</b>: (optional) various securement options</a></li><li><a href="#"><b>Insulation (top layer)</b>: mechanically fastened</a></li></li><li><a href="#"><b>Insulation (bottom layer)</b>: N/A</a></li><li><a href="#"><b>Air/Vapour control layer</b>: various securement options</a></li><li><a href="#"><b>Deck overlay (thermal barrier)</b>: various securement options</a></li><li><a href="#"><b>Roof deck</b></a></li> </ul></div></html>
| style="vertical-align:center;text-align:center;" | Report link
+
| style="vertical-align:center;text-align:center;" | [[AARS Tested Roof Assemblies | '''Report link 1-A''']]
| style="vertical-align:center;text-align:center;" | <b> 5, 10 </b>
 
 
| <html><!-- Single button --><div class="btn-group"><button type="button" class="btn btn-success dropdown-toggle" data-toggle="dropdown" aria-haspopup="true" aria-expanded="false">View options <span class="caret"></span></button><ul class="dropdown-menu"> <li><a href="#">Membrane Option 1</a></li><li><a href="#">Membrane Option 2</a></li><li><a href="#">Membrane Option 3</a></li> </ul></div></html>
 
| <html><!-- Single button --><div class="btn-group"><button type="button" class="btn btn-success dropdown-toggle" data-toggle="dropdown" aria-haspopup="true" aria-expanded="false">View options <span class="caret"></span></button><ul class="dropdown-menu"> <li><a href="#">Membrane Option 1</a></li><li><a href="#">Membrane Option 2</a></li><li><a href="#">Membrane Option 3</a></li> </ul></div></html>
 
| <html><!-- Single button --><div class="btn-group"><button type="button" class="btn btn-success dropdown-toggle" data-toggle="dropdown" aria-haspopup="true" aria-expanded="false">View options  <span class="caret"></span></button><ul class="dropdown-menu"> <li><a href="#">Membrane Option 1</a></li><li><a href="#">Membrane Option 2</a></li><li><a href="#">Membrane Option 3</a></li> </ul></div></html>
 
| <html><!-- Single button --><div class="btn-group"><button type="button" class="btn btn-success dropdown-toggle" data-toggle="dropdown" aria-haspopup="true" aria-expanded="false">View options  <span class="caret"></span></button><ul class="dropdown-menu"> <li><a href="#">Membrane Option 1</a></li><li><a href="#">Membrane Option 2</a></li><li><a href="#">Membrane Option 3</a></li> </ul></div></html>
Line 71: Line 68:
 
;[[AARS Tested Roof Assemblies#Guarantees | Tested Assemblies and RoofStar Guarantee Standards]]
 
;[[AARS Tested Roof Assemblies#Guarantees | Tested Assemblies and RoofStar Guarantee Standards]]
 
;[[AARS Tested Roof Assemblies#Substitutions | Accepted Materials and Material Substitutions]]
 
;[[AARS Tested Roof Assemblies#Substitutions | Accepted Materials and Material Substitutions]]
;[[AARS Tested Roof Assemblies#Insulation | Insulation]]
 
 
<hr>
 
<hr>
 
<div id="Responsibility"></div>
 
<div id="Responsibility"></div>
Line 108: Line 104:
 
<big><big>Tested Assemblies and RoofStar Guarantee Standards</big></big>
 
<big><big>Tested Assemblies and RoofStar Guarantee Standards</big></big>
  
Tested Assembly reports must always be read together with the '''''RoofStar Guarantee Standards''''' for the membrane system that is specified.  For example, a roof assembly might be tested with a particular material or in a particular way that does not conform to the Standards.  To conform to our Standards, some modifications to the Tested Assembly may be required, which may then preclude its use - for example, adding an insulation overlay panel where none was tested, because the assembly design requires one in order to conform to the '''''RoofStar Guarantee Standards'''''.   
+
Tested Assembly reports must always be read together with the '''''RoofStar Guarantee Standard''''' for the membrane system that is specified.  For example, a roof assembly might be tested with a particular material or in a particular way that does not conform to the Standard.  To conform to the Standard, some modifications to the Tested Assembly may be required, which may then preclude its use - for example, adding an insulation overlay panel where none was tested, because the assembly design requires one in order to conform to the Standard.   
  
When a conflict is apparent or obvious the ''Design Authority'' may find a way to 'yes' by examining the alternative materials listed in many Tested Assembly reports.  Alternatives include membranes, insulation overlays, insulation panels and roof deck overlays (commonly listed as "thermal layers").  Some materials are listed as "optional" which means that while the assembly was tested without the constituent material (a deck overlay, for example), the ''Design Authority'' may opt to use one of the materials listed in the report.  Drop-down menus of the tables displayed to the right (see the "View options" buttons) list Accepted Materials that can be used in each Tested Assembly.
+
When a conflict is apparent or obvious the ''Design Authority'' may find a way to 'yes' by examining the alternative materials listed in many Tested Assembly reports.  Alternatives include membranes, insulation overlays, insulation panels and roof deck overlays (commonly listed as "thermal layers").  Some materials are listed as "optional" which means that while the assembly was tested without the constituent material (a deck overlay, for example), the ''Design Authority'' may opt to use one of the materials listed in the report.  Drop-down menus of the tables displayed to the right (see the "View options" buttons) list Accepted Materials that can be used in each Tested Assembly.  Air or vapour control layers are not listed, because the '''''RoofStar Guarantee Program''''' does not accept and list these materials within Division C of the RPM.
  
If in doubt about how to use the Tested Assembly reports together with the '''''RoofStar Guarantee Standards''''', contact the [mailto:guarantees@rcabc.org '''''RoofStar Guarantee Program'''''] via email, or by calling (604) 882-9734.
+
If in doubt about how to use the Tested Assembly reports together with the '''''RoofStar Guarantee Standard''''', contact the [mailto:guarantees@rcabc.org '''''RoofStar Guarantee Program'''''] via email, or by calling (604) 882-9734.
 
<div id="Substitutions"></div>
 
<div id="Substitutions"></div>
 
<big><big>Accepted Materials and Material Substitutions</big></big>
 
<big><big>Accepted Materials and Material Substitutions</big></big>
Line 118: Line 114:
 
We have selected Tested Assembly reports based on the membranes that will qualify for a '''''RoofStar Guarantee Program''''', but there are tested assemblies that include one or more ''Secondary Materials'' that are not ''Accepted'' by the '''''RoofStar Guarantee Program'''''.  Drop-down lists clearly show this by indicating when a material is "not accepted".  To ensure that the entire roof system complies with the Accepted Material requirements of the '''RoofStar Guarantee Program''', follow the requirements in '''3.2.1 Material Substitutions in Tested Assemblies''':  
 
We have selected Tested Assembly reports based on the membranes that will qualify for a '''''RoofStar Guarantee Program''''', but there are tested assemblies that include one or more ''Secondary Materials'' that are not ''Accepted'' by the '''''RoofStar Guarantee Program'''''.  Drop-down lists clearly show this by indicating when a material is "not accepted".  To ensure that the entire roof system complies with the Accepted Material requirements of the '''RoofStar Guarantee Program''', follow the requirements in '''3.2.1 Material Substitutions in Tested Assemblies''':  
  
:"When a manufacturer's Tested Assembly incorporates materials (and listed alternates) that are not part of the RoofStar Guarantee Program, the Design Authority must identify appropriate substitutions for those materials from the list of RoofStar-accepted Materials and consult the manufacturer concerning compatibility with the Tested Assembly. and direct the user to consult the membrane manufacturer in order to determine which ''Accepted'' materials will qualify as alternates."
+
:"When a manufacturer's Tested Assembly incorporates materials (and listed alternates) that are not part of the '''''RoofStar Guarantee Program''''', the ''Design Authority'' must identify appropriate substitutions for those materials from the list of RoofStar-accepted Materials and consult the manufacturer concerning compatibility with the Tested Assembly. and direct the user to consult the membrane manufacturer in order to determine which ''Accepted'' materials will qualify as alternates."
<div id="Insulation"></div>
+
 
<big><big>Insulation</big></big>
+
 
  
The attentive reader will notice that many roof assembly tests were conducted with only one layer of flat board insulation.  Many of these roof assembly tests predate the release of the 2018 ''British Columbia Building Code'' which is performance-based and references the National Energy Code of Canada for Buildings (NECB).  To achieve the minimum effective thermal resistance values for building enclosure systems, multiple layers of insulation boards are most certainly necessary, and will eliminate thermal bridges and consequential energy loss.  The impact of this requirement on the use of Tested Assemblies will be obvious to the reader; multiple layers of insulation will not necessarily resist Specified Wind Loads in the same a tested single layer would.  The reason for this lies in the nature of the "chain of connectivity".  Each Tested Assembly is predicated on a specific number and type of links between constituent components; adding a new link may change the wind resistance performance characteristics of the entire assembly (ref. CSA-A123.21, Annex F ''Component Swap Flow Diagrams'' (informative only)). Therefore, the ''Design Authority'' should consult with the primary (membrane) manufacturer of the roof assembly test and obtain a signed and dated letter of assurance concerning the use of additional insulation layers in the proposed roof design.
 
  
The use of tapered insulation commonly specified to achieve a positive slope for drainage is also a reason to consult with the manufacturer.  Roof assembly tests do not use tapered insulation; a design that incorporates tapered panels may not achieve the same DUR as the Tested Assembly, for at least reasons:
 
*the type of tapered insulation specified for the roof design may not be the same as the insulation type used in the Tested Assembly.
 
*the minimum thickness of tapered insulation will most certainly be less than the minimum thickness of flat board insulation used in the Tested Assembly, which means less mass at the thinnest point of the tapered panel.
 
<br>
 
In each case, the use of tapered insulation ''may'' adversely affect the wind resistance performance characteristics of the entire assembly.  Therefore, the ''Design Authority'' should consult with the membrane manufacturer who undertook the assembly test, to determine whether additional securement of the roof assembly in each of the three roof zones is required.
 
 
|}
 
|}
 
</tab>
 
</tab>

Latest revision as of 16:29, 15 November 2021

NOTICE to READER

Before you use these tables, make sure you know the wind load requirements for the roof under design or construction. You can find guidance in Part 3 SECURING the ROOF ASSEMBLY of the membrane system that is specified. Specified Wind Loads for the three principal roof zones may be calculated either by using the formulae in the British Columbia Building Code, 4.1.7 Wind Loads, or by using the National Research Council's online tool, Wind-RCI online wind calculator.

Table Structure and Organization

The tables on the adjacent tabs display data drawn from, and links to, Tested Assembly Reports listed by the membrane type shown on the tab heading. All test reports are downloadable from the "Test Report" column, and are catalogued under a RoofStar numbering system that may differ from the number designation on the report. Dynamic Wind Uplift (DUR) values are shown in columns near the left side of the tables. Only the DUR and Manufacturer columns are sortable; to sort a column, click the column heading. Click on any drop-down button to try the demo table below.

Tested Assembly Report Data Primary Materials Other System Materials & Deck
Manufacturer Dynamic Uplift Resistance Roof
Assembly
Summary
Test Report Cap
Membrane
Base
Membrane
Plies Insulation
Overlay
Insulation Deck
Overlay
Deck
Type
kPa Psf
Manufacturer -1.9 -40 Report link 1-A 1, 2 or 3 Deck type

Each row displays one test for a particular system of securement. That means that the DUR derived for that test is based on a particular pattern of fasteners or adhesive application. Most assemblies were tested with one system of securement, but some were tested with as many as four. When this is the case, the same report number will be displayed with test report names such as [Manufacturer X] MARS 1-A and [Manufacturer X] MARS 1-B. Read the test report details to see what was changed in the securement system that affected the DUR for the assembly.

Every table displays Tested Assembly report data in easy-to-read rows with drop-down buttons that display key information for each assembly (see the working example above). When the Tested Assembly uses a membrane with 2 or more plies, each membrane and its options is listed in separate columns.

Note that some tests were conducted without one or more of these constituent components and may list those materials as "optional". When a material category such as "insulation overlay" is absent from the test, the drop-down menu will indicate its absence with "N/A" or as "optional". Occasionally, a missing material poses a conflict with the RoofStar Guarantee Standards. When the conflict is obvious, the Roof Assembly Summary will normally flag this with a note at the bottom of the list. Notwithstanding these notes, the reader is responsible to understand and apply the RoofStar Guarantee Standards regardless of the Tested Assembly report (see below under Tested Assemblies and RoofStar Guarantee Standards).

The Roof Assembly Summary provides a quick overview of how the roof assembly is secured. This feature of the tables will be especially helpful when searching for a suitable PARS assembly, because the placement of mechanical fasteners within an assembly can vary widely. Note, however, that the summaries do not list sizes, types or spacing of specific adhesives or fasteners; these details must be obtained from a careful reading of the Tested Assembly report.

Contents

Specified Wind Loads and User Responsibility
CSA-A123.21 and Tested Assembly Reports
Tested Assemblies and RoofStar Guarantee Standards
Accepted Materials and Material Substitutions

Specified Wind Loads and User Responsibility

The tables on this page display a collection of test data and downloadable reports offered for the purpose of designing and constructing a roof capable of resisting negative wind pressures, commonly referred to as "wind uplift" loads. The data and reports are offered without endorsement by the RCABC; they are provided as a courtesy by the RoofStar Guarantee Program to assist the Design Authority with the task of designing a roof that satisfies Code requirements, that meets the designer's specific and numerous design preferences, and that will qualify for a RoofStar Guarantee.

The British Columbia Building Code (or the Code having jurisdiction) requires a roof to be capable of resisting Specified Wind Loads (see the British Columbia Building Code, Part 4 (4.1.7 Wind Loads) and Part 5 (5.2.2.2 Determination of Wind Load), inclusive of the notes in the appendices). The reader will note that there are optional pathways by which a membrane roof design can comply with the Code. One pathway is the use of a "Tested Assembly" - a roof assembly tested in controlled laboratory conditions to resist simulated wind pressures and gusts. The test must be conducted in strict conformity to CSA-A123.21 Standard test method for the dynamic wind uplift resistance of membrane roofing systems (CSA-A123.21). The results of the test are published in a report signed off by the accredited testing agency. Each report details the materials and securement methods of the assembly. Every detail in a Tested Assembly report is critical for the performance of a roof designed on the basis of the tested assembly.

CSA-A123.21 classifies assembly tests by the method of securement, and these are simplified with three acronyms:

  • AARS (Adhesive Applied Roof Systems)
  • PARS (Partially Adhered Roof Systems)
  • MARS (Mechanically Attached Roof Systems).


For a fuller explanation of these three classifications, see Part 3 SECURING the ROOF ASSEMBLY of the membrane system that is specified.

CSA-A123.21 requires that the published test limits for a roof system be adjusted by dividing the final test value by a safety factor of 1.5. This factor reduces the actual test results in order to account for variables that a laboratory cannot test for, such as strong wind gusts or sudden wind shifts. The tables displayed in the tabs to the right show only the adjusted Dynamic Uplift Resistance (DUR) values and can be validated by reviewing the downloadable test reports.

It is imperative that the user of these reports become familiar with the structure and content typical in a Tested Assembly report. While you will see that each accredited testing agency publishes test results in their own preferred format, there is general consistency among the report styles in the type of data each report provides:

  • a designation of the securement system (AARS, PARS or MARS), although some reports do not do this and the classification of the test can be determined only by reading the report
  • the DUR (most reports make this explicit at or near the top of the report although there are some reports that provide the DUR within the report text)
  • a list of tested and alternate materials
  • how each material was secured, and
  • the size of fasteners or the types of adhesive used.


All of these variables, and more, affect the performance of the roof assembly. Care must therefore be taken to collect and analyze all this information in relation to the limitations of the building and the roof, and all these details (for example, the specific name of the adhesive and how it was applied) must be included in the design specifications that will ultimately guide the construction of the roof.

CSA-A123.21 and Tested Assembly Reports

The CSA-A123.21 Standard test method for the dynamic wind uplift resistance of membrane roofing systems (CSA-A123.21) is, properly speaking, a test for membrane roof systems where the membrane is exposed to the weather. Consequently, you will not find Tested Assembly reports that apply to Protected Membrane Roof Assemblies (where the membrane lies beneath the constituent components of a roof assembly). To secure PMRAs, refer to Part 3 of the membrane system that is specified.

A few roof systems were tested without insulation. Most of these were tested on a plywood deck, but some were tested on steel. Because these assemblies are listed together with reports for insulated roofs (also referred to as compact or conventional), the reader should always look beyond the DUR and read the test report in order to understand the entire assembly.

Each Tested Assembly report displays the date the assembly was tested and often will also publish the anticipated revaluation date. Some of the test reports available for download in the tables on this page have passed the revaluation date, but may still be valid; while we attempt to make available current test reports, we leave older reports available through the RPM because the assembly may have been retested but we have not been provided with a new test report. The reader is responsible to check with the manufacturer who owns the test report, to verify that the validity of the test and the published DURs.

Tested Assemblies and RoofStar Guarantee Standards

Tested Assembly reports must always be read together with the RoofStar Guarantee Standard for the membrane system that is specified. For example, a roof assembly might be tested with a particular material or in a particular way that does not conform to the Standard. To conform to the Standard, some modifications to the Tested Assembly may be required, which may then preclude its use - for example, adding an insulation overlay panel where none was tested, because the assembly design requires one in order to conform to the Standard.

When a conflict is apparent or obvious the Design Authority may find a way to 'yes' by examining the alternative materials listed in many Tested Assembly reports. Alternatives include membranes, insulation overlays, insulation panels and roof deck overlays (commonly listed as "thermal layers"). Some materials are listed as "optional" which means that while the assembly was tested without the constituent material (a deck overlay, for example), the Design Authority may opt to use one of the materials listed in the report. Drop-down menus of the tables displayed to the right (see the "View options" buttons) list Accepted Materials that can be used in each Tested Assembly. Air or vapour control layers are not listed, because the RoofStar Guarantee Program does not accept and list these materials within Division C of the RPM.

If in doubt about how to use the Tested Assembly reports together with the RoofStar Guarantee Standard, contact the RoofStar Guarantee Program via email, or by calling (604) 882-9734.

Accepted Materials and Material Substitutions

We have selected Tested Assembly reports based on the membranes that will qualify for a RoofStar Guarantee Program, but there are tested assemblies that include one or more Secondary Materials that are not Accepted by the RoofStar Guarantee Program. Drop-down lists clearly show this by indicating when a material is "not accepted". To ensure that the entire roof system complies with the Accepted Material requirements of the RoofStar Guarantee Program, follow the requirements in 3.2.1 Material Substitutions in Tested Assemblies:

"When a manufacturer's Tested Assembly incorporates materials (and listed alternates) that are not part of the RoofStar Guarantee Program, the Design Authority must identify appropriate substitutions for those materials from the list of RoofStar-accepted Materials and consult the manufacturer concerning compatibility with the Tested Assembly. and direct the user to consult the membrane manufacturer in order to determine which Accepted materials will qualify as alternates."



Tested Assembly Report Data Primary Materials Other System Materials & Deck
Manufacturer Dynamic Uplift Resistance Roof
Assembly
Summary
Test Report Cap
Membrane
Base
Membrane
Plies Insulation
Overlay
Insulation Deck
Overlay
Deck
Type
kPa Psf
Click arrows to sort
Henry Company Canada -3.83 -80 HEN AARS 1-A 2
Steel
Henry Company Canada -4.79 -100 HEN AARS 2-A 2 Steel
IKO Industries Ltd. -4.8 -100 IKO AARS 1-A 2
Steel
IKO Industries Ltd. -2.4 -50 IKO AARS 2-A 2
Steel
IKO Industries Ltd. -4.2 -87 IKO AARS 3-A 2
Steel
IKO Industries Ltd. -4.2 -87 IKO AARS 4-A 2
Steel
IKO Industries Ltd. -4.8 -100 IKO AARS 5-A 2
Steel
IKO Industries Ltd. -2.4 -50 IKO AARS 6-A 2
Steel
IKO Industries Ltd. -4.2 -87 IKO AARS 7-A 2
Steel
IKO Industries Ltd. -3.8 -80 IKO AARS 8-A 2
Steel
IKO Industries Ltd. -2.4 -50 IKO AARS 9-A 2
Steel
IKO Industries Ltd. -3.8 -80 IKO AARS 10-A
2
Steel
IKO Industries Ltd. -3.4 -70 IKO AARS 12-A
2
Steel
IKO Industries Ltd. -3 -62.5 IKO AARS 13-A 2
Steel
IKO Industries Ltd. -4.8 -100 IKO AARS 14-A 2
Steel
IKO Industries Ltd. -4.8 -100 IKO AARS 15-A 2
Steel
IKO Industries Ltd. -3 -62.5 IKO AARS 16-A
2
Steel
IKO Industries Ltd. -4.2 -87 IKO AARS 17-A 2
Steel
IKO Industries Ltd. -3.6 -75 IKO AARS 18-A 2
Steel
IKO Industries Ltd. -5.5 -115 IKO AARS 19-A 2
Plywood
17mm (5/8")
IKO Industries Ltd. -5.5 -115 IKO AARS 20-A 2
Plywood
17mm (5/8")
IKO Industries Ltd. -3.6 -75 IKO AARS 21-A
2
Steel
IKO Industries Ltd. -7.2 -150 IKO AARS 22-A
2
Plywood
17mm (5/8")
IKO Industries Ltd. -5.5 -115 IKO AARS 23-A 2
Steel
IKO Industries Ltd. -5.9 -122.5 IKO AARS 24-A 2
Steel
Siplast, Inc. -2.87 -60 SIP AARS 1-A
2
Steel
Siplast, Inc. -3.35 -70 SIP AARS 2-A
2
Steel
Siplast, Inc. -3.4 -70 SIP AARS 3-A 2
Steel
Siplast, Inc. -2.3 -47 SIP AARS 4-A 2
Steel
Siplast, Inc. -1.9 -40 SIP AARS 5-A 2
Steel
Siplast, Inc. -3.9 -82 SIP AARS 6-A 2 Steel
Siplast, Inc. -5.2 -109 SIP AARS 7-A 2
Steel
Siplast, Inc. -1.4 -30 SIP AARS 8-A 2
Plywood
15mm (19/32")
Soprema Inc. -4.3 -87.3 SOP AARS 1-A 2
Steel
Soprema Inc. -4 -83.3 SOP AARS 2-A 2
Plywood
17mm (5/8")
Soprema Inc. -2.9 -60 SOP AARS 3-A
2
Steel
Soprema Inc. -3 -63 SOP AARS 4-A 2
Steel
Soprema Inc. -2.4 -50 SOP AARS 5-A 2
Steel
Soprema Inc. -3 -63 SOP AARS 6-A 2
Steel
Soprema Inc. -4.3 -90 SOP AARS 7-A 2 Steel
Soprema Inc. -3.4 -72 SOP AARS 8-A 2
Steel
Soprema Inc. -4.8 -100 SOP AARS 8-B 2
Steel
Soprema Inc. -3 -62 SOP AARS 9-A 2
Steel
Soprema Inc. -2.4 -50 SOP AARS 10-A 2
Steel
Soprema Inc. -3.9 -83 SOP AARS 10-B 2
Steel
Soprema Inc. -4.6 -96 SOP AARS 10-C 2
Steel
Soprema Inc. -1.9 -40 SOP AARS 11-A 2
Steel
Soprema Inc. -3.9 -83 SOP AARS 11-B 2
Steel
Soprema Inc. -3.6 -75 SOP AARS 12-A 2
Steel
Soprema Inc. -4.2 -87 SOP AARS 12-B 2
Steel
Soprema Inc. -4.3 -90 SOP AARS 12-C 2
Steel
Soprema Inc. -3.6 -75 SOP AARS 13-A 2 Steel
Soprema Inc. -3.8 -80 SOP AARS 13-B 2 Steel
Soprema Inc. -2.4 -50 SOP AARS 14-A 2
Steel
Soprema Inc. -2.4 -50 SOP AARS 15-A 2
Steel
Soprema Inc. -4.2 -87 SOP AARS 16-A 2
Steel
Soprema Inc. -4.3 -90 SOP AARS 16-B 2
Steel
Soprema Inc. -4 -83 SOP AARS 17-A 2
Plywood
19mm (3/4")
Soprema Inc. -2.4 -50 SOP AARS 18-A
2
Steel
Soprema Inc. -2.4 -50 SOP AARS 18-B
2
Steel
Soprema Inc. -3.4 -72 SOP AARS 19-A 2
Steel
Soprema Inc. -4.8 -100 SOP AARS 19-B 2
Steel
Soprema Inc. -4.3 -90 SOP AARS 20-A 2 Steel
Soprema Inc. -3 -63 SOP AARS 21-A
2 Steel
Soprema Inc. -1.8 -37 SOP-AARS 22-A
2 Steel
Soprema Inc. -1.9 -40 SOP-AARS 22-B
2 Steel
Soprema Inc. -2.4 -50 SOP-AARS 22-C
2 Steel
Soprema Inc. -3.4 -70 SOP-AARS 23-A
2 Steel
Soprema Inc. -2.4 -50 SOP-AARS 24-A
2 Steel
Soprema Inc. -3.6 -75 SOP-AARS 25-A
2
Steel
Soprema Inc. -2.4 -50 SOP-AARS 26-A
2
Steel
Tremco Ltd. -2.5 -53 TRE AARS 1-A 2
Steel
Tremco Ltd. -1.4 -29 TRE AARS 2-A 2
Steel
Tested Assembly Report Data Primary Materials Other System Materials & Deck
Manufacturer Dynamic Uplift Resistance Roof
Assembly
Summary
Test Report Membrane Plies Insulation
Overlay
Insulation Deck
Overlay
Deck
Type
kPa Psf
Elevate (formerly Firestone) -2 -41 FIR AARS 1-A 1
Steel
Tested Assembly Report Data Primary Materials Other System Materials & Deck
Manufacturer Dynamic Uplift Resistance Roof
Assembly
Summary
Test Report Membrane Plies Insulation
Overlay
Insulation Deck
Overlay
Deck
Type
kPa Psf
Elevate (formerly Firestone) -2.4 -50 FIR AARS 2-A 1
Steel
IKO Industries Ltd. -4.19 -87.5 IKO-AARS 25-A 1
Steel
IKO Industries Ltd. -2.39 -50 IKO-AARS 26-A 1
Steel

No Tested Assemblies submitted

Tested Assembly Report Data Primary Materials Other System Materials & Deck
Manufacturer Dynamic Uplift Resistance Roof
Assembly
Summary
Test Report Membrane Plies Insulation
Overlay
Insulation Deck
Overlay
Deck
Type
kPa Psf
IKO Industries Ltd. -4.9 -100 IKO AARS 11-A 4
Steel

Home