Difference between revisions of "SBS Fire Separation Joint"

Jump to: navigation, search

Difference between revisions of "SBS Fire Separation Joint"

(WORK INCLUDED)
 
(35 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:10.3.4.3.jpg]]
+
{{Template:RPM Info}}
  
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>SBS | Fire Separation Joint ([[SBS_Roof_Systems_Standard#10.3.4.4. Fire Separation Walls | Article 10.3.4.4.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:10.3.4.3.jpg|link=http://rpm.rcabc.org/images/4/43/10.3.4.3.jpg | class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
 +
 +
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
+
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority.
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
+
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority.
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Division C|'''Accepted Materials''']] section of this Manual.
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Where required.
+
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required.
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
+
;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_9| '''Membrane Protection''']]
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''MembraneFlashing''']]:>
+
;(6) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']]
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Membrane Counter Flashing''']]
+
;(7) [[SBS Roof Systems Standard#PART_13|'''Membrane Counter Flashing''']]
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
+
;(8) [[SBS Roof Systems Standard#PART_10|'''Base Metal Flashing''']]: Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
 
;(9) <b>Metal Flashing / Cladding</b>
 
;(9) <b>Metal Flashing / Cladding</b>
;(10)  '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See Inset, Section 10.3), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall.
+
;(10)  '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See inset in detail [[SBS Fire Separation Wall| SBS | Separation Wall]]), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall.
;(11) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Standing seam joints required.
+
;(11) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Standing seam joints required.
 +
 
 +
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]
;(B) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Acceptable Wall Surface (Plywood)''']]
+
;(B) [[SBS Roof Systems Standard#PART_2|'''Acceptable Wall Surface''']]
 
;(C) '''Wood Blocking'''
 
;(C) '''Wood Blocking'''
 
;(D) '''Grouted Finish''': Sloped surface to promote drainage off cap flashing.
 
;(D) '''Grouted Finish''': Sloped surface to promote drainage off cap flashing.
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
 
+
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
 
 
  
 
<hr>
 
<hr>
  
 +
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
 
 
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 

Latest revision as of 21:52, 16 September 2022



Division D - Construction Details


SBS | Fire Separation Joint ( Article 10.3.4.4.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

10.3.4.3.jpg

1 WORK INCLUDED

(1) Supporting Deck Overlay
If required by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
Where required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing
(7) Membrane Counter Flashing
(8) Base Metal Flashing
Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
(9) Metal Flashing / Cladding
(10) Secondary Metal Cap Flashing
Joints to be offset from Cap Flashing, OR Water Channeling Clip may be used (See inset in detail SBS | Separation Wall), OR solder standing seam joints. Do NOT place combustible materials over top of firewall.
(11) Metal Cap Flashing
Standing seam joints required.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Acceptable Wall Surface
(C) Wood Blocking
(D) Grouted Finish
Sloped surface to promote drainage off cap flashing.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.