Difference between revisions of "SBS Flanged Insert Drain"

Jump to: navigation, search

Difference between revisions of "SBS Flanged Insert Drain"

(Created page with "File:10.3.6.2.jpg === WORK INCLUDED === (1) <b>Gypsum Overlay Board: </b>If required by design authority. (2) <b>Vapour Retarder</b>: If required by design authority. (...")
 
(30 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[File:10.3.6.2.jpg]]
+
{{Template:RPM Info}}
  
=== WORK INCLUDED ===
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
(1) <b>Gypsum Overlay Board: </b>If required by design authority.
+
__NOTOC__
  
(2) <b>Vapour Retarder</b>: If required by design authority.
+
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>SBS | Flanged Insert Drain ([[SBS_Roof_Systems_Standard#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:10.3.6.2.jpg| link=http://rpm.rcabc.org/images/7/78/10.3.6.2.jpg | class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
(3) <b>Insulation:</b> See list of accepted materials in Section 2.2.
+
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority.
 +
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority.
 +
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 +
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required.
 +
;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_9| '''Membrane Protection''']]
 +
;(6) '''Mastic''':  As approved by manufacturer.
 +
;(7) [[SBS Roof Systems Standard#PART_11|'''Roof Drain Membrane Flashing''']]: Onto primed drain flange or adhesive for non-bituminous flexible membrane systems. See also [[SBS Roof Systems Standard#PART_11| '''11.2.1 General''']] for membrane material requirements.
  
(4) <b>Insulation Overlay</b>: Where required. See <i>RGC Guarantee Standard B4.1, B4.2 </i>and<i> C4.1</i>
+
<hr>
 
 
(5) <b>Primary Membrane and Membrane Protection</b>
 
 
 
(6) <b>Mastic:</b>  As approved by manufacturer.
 
 
 
(7)<b> </b><b>Membrane Flashing:</b> Onto primed drain flange or adhesive for non-bituminous flexible membrane systems.
 
 
 
=== RELATED WORK BY OTHERS ====
 
(A) <b>Acceptable Deck</b>
 
 
 
(B) <b>Roof Drain Assembly</b>
 
  
;NOTE:
+
=== RELATED WORK BY OTHERS ===
*Refer to <i>RGC Guarantee Standards</i> for additional requirements
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]
*Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.
+
;(B) [[SBS Roof Systems Standard#PART_11|'''Roof Drain Assembly''']]
  
:Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
* Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
 +
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
 
 
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 

Revision as of 17:49, 27 June 2022



Division D - Construction Details


SBS | Flanged Insert Drain ( Article 11.3.3.6.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

10.3.6.2.jpg

1 WORK INCLUDED

(1) Supporting Deck Overlay
If required by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
Where required.
(5) Primary Membrane and Membrane Protection
(6) Mastic
As approved by manufacturer.
(7) Roof Drain Membrane Flashing
Onto primed drain flange or adhesive for non-bituminous flexible membrane systems. See also 11.2.1 General for membrane material requirements.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Roof Drain Assembly
  • Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.