Difference between revisions of "SBS Metal Edge Termination"

Jump to: navigation, search

Difference between revisions of "SBS Metal Edge Termination"

(WORK INCLUDED)
 
(3 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
<hr>
 
<hr>
 
<big><big><big><big><big>SBS | Metal Edge Termination ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big>
 
<big><big><big><big><big>SBS | Metal Edge Termination ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])</big></big></big></big></big>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:Construction Details Header}}
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[SBS Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
Line 20: Line 16:
 
</div>
 
</div>
  
::Click below for a printable version of this page (under development)
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=|'''Print Sheet''']]
 
</div>
 
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
  
Line 31: Line 22:
 
;(1) Primer: For self-adhered or torch-applied base membranes, as required by the membrane manufacturer.
 
;(1) Primer: For self-adhered or torch-applied base membranes, as required by the membrane manufacturer.
 
;(2) [[SBS Roof Systems Standard#PART_9|'''Base Membrane (field)''']]: Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements).  See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options.  See '''9.3''' for application requirements.
 
;(2) [[SBS Roof Systems Standard#PART_9|'''Base Membrane (field)''']]: Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements).  See Tables '''9.1''' and '''9.2''' for acceptable membrane types and securement options.  See '''9.3''' for application requirements.
;(3) [[SBS Roof Systems Standard#PART_10|'''Mastic''']]: Applied beneath metal edge flashing.  Refer to '''10.3.5.2''' ('''3''')('''2''').
+
;(3) [[SBS Roof Systems Standard#PART_10|'''Mastic''']]: Applied beneath metal edge flashing.  Refer to [[SBS Roof Systems Standard#10.3.4.2. Low Profile Edges | Article 10.3.4.2.]]
;(4) [[SBS Roof Systems Standard#PART_10|'''Metal Edge Flashing''']]: See '''13.3.2 Fabrication''' for manufacturing requirements.  See also '''10.3.1.4 Low Roof Edges''' for application standards and securement.  Hemmed edges are required; a kicked-out drip edge is optional but recommended (cf. '''13.1.2.2''' ('''10''')).
+
;(4) [[SBS Roof Systems Standard#PART_10|'''Metal Edge Flashing''']]: See '''13.3.2 Fabrication''' for manufacturing requirements.  See also [[SBS Roof Systems Standard#10.3.4.2. Low Profile Edges | Article 10.3.4.2., "Low Profile Edges]] for application standards and securement.  Hemmed edges are required; a kicked-out drip edge is optional but recommended (See [[SBS Roof Systems Standard#13.1.3.5. Fit and Finish | Article 13.1.3.5., "Fit and Finish"]].
 
;(5) [[SBS Roof Systems Standard#PART_10|'''Base Membrane (flashing)''']]: Applied to overlap metal flashing and the field base membrane.
 
;(5) [[SBS Roof Systems Standard#PART_10|'''Base Membrane (flashing)''']]: Applied to overlap metal flashing and the field base membrane.
;(6) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Installed according to '''Part 9''' standards and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant (cf. '''10.3.5.2''' ('''3''')('''7''')('''2''')).
+
;(6) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Installed according to '''Part 9''' requirements and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant ([[SBS Roof Systems Standard#10.3.4.2. Low Profile Edges | Article 10.3.4.2.]]).
  
 
<hr>
 
<hr>

Latest revision as of 17:55, 27 October 2023



Division D - Construction Details


SBS | Metal Edge Termination ( Article 10.3.4.2.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

SBS 10.3.5.2 Metal Edge.jpg

1 WORK INCLUDED

(1) Primer
For self-adhered or torch-applied base membranes, as required by the membrane manufacturer.
(2) Base Membrane (field)
Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
(3) Mastic
Applied beneath metal edge flashing. Refer to Article 10.3.4.2.
(4) Metal Edge Flashing
See 13.3.2 Fabrication for manufacturing requirements. See also Article 10.3.4.2., "Low Profile Edges for application standards and securement. Hemmed edges are required; a kicked-out drip edge is optional but recommended (See Article 13.1.3.5., "Fit and Finish".
(5) Base Membrane (flashing)
Applied to overlap metal flashing and the field base membrane.
(6) Cap Membrane (field)
Installed according to Part 9 requirements and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant ( Article 10.3.4.2.).

2 RELATED WORK BY OTHERS

(A) Acceptable Substrate
Representative
(B) Wall Assembly
Representative

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.