SBS Through-wall Scupper Drain

Jump to: navigation, search

SBS Through-wall Scupper Drain

Revision as of 18:10, 7 September 2021 by James Klassen (talk | contribs)



Division D - Construction Details


SBS 11.3.2.5-2 Scuppers and Overflows (through-wall scupper)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

10.3.6.5.jpg

1 WORK INCLUDED

(1) Air or Vapour Control Layers
If required by design authority.
(2) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay
Where required.
(4) Primary Membrane and Membrane Protection
(5) Base Membrane Flashing
(6) Metal Scupper with Hopper
The outside face of scupper to be minimum 37.7mm (1½") lower than the box height with a 12.7mm (½") drip edge. Installed in a bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
(7) Mastic
Compatible with membrane
(8) Scupper Membrane Flashing
(9) Base Metal Flashing
Mechanically fastened (optional on flexible membrane systems).
(10)Metal Counter-flashing
Into reglet approximately 30 mm (1 ¼").

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Air / Vapour Seal
(C) Wood Blocking
Optional with insulation cant strips.
(D) Plywood
If required by design authority. See the RoofStar Guarantee Standards.
(E) Wall Finish
Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.