Difference between revisions of "ASM Ridge (Unvented, Uninsulated)"

Jump to: navigation, search

Difference between revisions of "ASM Ridge (Unvented, Uninsulated)"

Line 1: Line 1:
 +
<hr>
 
[[File:8.1.4.11.1.jpg]]
 
[[File:8.1.4.11.1.jpg]]
  
Line 32: Line 33:
  
  
 +
 +
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Application'']]
 +
 +
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
  
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]

Revision as of 22:46, 21 December 2015


8.1.4.11.1.jpg


1 WORK INCLUDED

(1) Underlayment: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).

(2) Slip Sheet: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.

(3) Architectural Metal Roof Panel: Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.

(4) ‘Z’ Closure: Set in accepted caulking and secured with compatible non-corrosive, flathead fasteners.

OR

(5) Preformed Foam Closure: Set in accepted caulking.

(6) Metal Cap Flashing: Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under 12.7 mm (1/2"). Fastened to each standing seam with high domed gasketed cladding screws or hooked to ‘Z’ closures.

(7) Drag Load Fastening: Compatible non-corrosive fasteners.


2 RELATED WORK BY OTHERS

(A) Acceptable Deck

(B) Wood Nailer

NOTE: * Refer to RGC Guarantee Standards for additional requirements.



Back to ASM Application

Back to ASM Construction Details

Back to Construction Details