<big><big><big><big><big>SBS | Low Door Opening ([[SBS_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])</big></big></big></big></big> | <big><big><big><big><big>SBS | Low Door Opening ([[SBS_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])</big></big></big></big></big> | ||
− | { | + | {{Template:Construction Details Header}} |
− | |||
− | |||
− | |||
− | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> |
Revision as of 18:52, 27 June 2022
Division D - Construction Details
SBS | Low Door Opening ( Article 10.3.4.5.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Air/Vapour barrier
- Self-adhered membrane, as specified in design. Install following manufacturer’s requirements.
- (2) Roof system
- Conventionally insulated system shown (refer to the membrane Standard for requirements).
- (3) Field Membrane
- SBS-modified bituminous system shown (see Part 9 for standards)
- (4) Self-adhered membrane (pre-flashing)
- Apply over rough sill or sill woodwork. Prime as required.
- (5) Metal water-stop flashing
- Dimensions as specified in design. Mechanically attach to inside face of door sill. Cut flashing to fit opening width.
- (6) Membrane flashing
- Base membrane shown. Install to overlap and seal in metal water-stop flashing.
- (7) Membrane gussets
- Install in corners to seal joints.
- (8) Metal base flashing (under door)
- Optional; protection for membrane when pavers are installed (shown), or when exposed membrane is vulnerable to damage. Mechanical fasteners must be at least 87.5 mm (3-1/2”) above the drainage plane.
- (9) Membrane flashing
- Applicable for exterior-insulated walls. Seals roof membrane flashing to air/vapour barrier on wall and provides sufficient exposure for positive union with WRB (by others). Mechanically secure membrane (metal base flashing used for securement in this detail).
- (10) Metal base flashing (walls)
- Optional; protects membrane flashing from damage, and functions as removable panel to permit access to membrane flashing for future replacement.
- (11) Pavers and pedestals
- May be installed by others, if specified. See Part 14 for material and application requirements. Must be at least 12 mm (1/2”) away from other pavers, and from membrane flashing or metal base flashing, to permit adequate drainage.
2 RELATED WORK BY OTHERS
- (A) Wall and cladding
- Generic and representative only.
- (B) WRB (Water Resistant Barrier)
- Generic and representative only.
- (C) Door and jamb assembly
- Generic and representative only.
NOTE: See the Standard for additional requirements.