Difference between revisions of "ASM Ridge (Vented, Uninsulated)"

Jump to: navigation, search

Difference between revisions of "ASM Ridge (Vented, Uninsulated)"

(Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>...")
 
 
(2 intermediate revisions by the same user not shown)
Line 27: Line 27:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[ASM Roof Systems Standard#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
+
;(1) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment''']]: The type of underlay required is determined by roof slope.
;(2) [[ASM Roof Systems Standard#ASMSEP-VENT|'''Separation layer''']]: Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems.  The material must be located between the insulation and metal panels (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
+
;(2) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventilation beneath panels'']]: Required on slopes less than 1:3 (4” in 12”), beneath curved panel systems, and recommended when the roof slope exceeds 1:3 (4” in 12”).
;(3) [[ASM Roof Systems Standard#ASMCLIP |'''Architectural metal panel clip''']]: When a ventilation material is specified or required (Item 2), clips must be supported on an EPDM pad  (not illustrated) or supported according to the standards in [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Separation_and_Ventilation_Layers '''8.3.3 Separation and Ventilation Layers'''].
+
;(3) [[ASM Roof Systems Standard#9.2.1.5.Clips|'''Architectural metal panel clip''']]: When a ventilation material is specified or required (Item 2), clips must be supported on an EPDM pad  (not illustrated) or supported according to the standards in [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Separation_and_Ventilation_Layers '''8.3.3 Separation and Ventilation Layers'''].
;(4) & (5) [[ASM Roof Systems Standard#ASMCLOSURE |'''Architectural metal roof panel''']]: Top end of panels must be "bread-panned (5).
+
;(4) & (5) [[ASM Roof Systems Standard#9.3.2.6. Panel Terminations |'''Architectural metal roof panel''']]: Top end of panels must be "bread-panned (5).
;(6) [[ASM Roof Systems Standard#ASMDRAG |'''Drag-load fasteners''']]: Compatible non-corrosive fasteners.
+
;(6) [[ASM Roof Systems Standard#9.2.1.4.Fasteners |'''Drag-load fasteners''']]: Compatible non-corrosive fasteners.
;(7) [[ASM Roof Systems Standard#ASMSEALANT |'''Sealant''']]
+
;(7) [[ASM Roof Systems Standard#9.2.1.7. Sealants |'''Sealant''']]
;(8) [[ASM Roof Systems Standard#ASMZ |''''Z' Closure''']]: Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
+
;(8) [[ASM Roof Systems Standard#9.3.2.6. Panel Terminations |''''Z' Closure''']]: Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
 
;(9) Ventilation screen
 
;(9) Ventilation screen
;(10) [[ASM Roof Systems Standard#ASMZ | '''Ridge cap flashing''']]: Hooked onto ventilation screen.
+
;(10) [[ASM Roof Systems Standard#10.3.4.1. Ridges | '''Ridge cap flashing''']]: Hooked onto ventilation screen.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[ASM Roof Systems Standard#ASMDECK|'''Acceptable Deck''']]: Installed with ventilation gap at peak.
+
;(A) [[ASM Roof Systems Standard#PART_2|'''Acceptable Deck''']]: Installed with ventilation gap at peak.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->

Latest revision as of 18:24, 28 June 2022



Division D - Construction Details


ASM | Ridge (Vented, Uninsulated) ( Article 10.3.2.3. and Article 10.3.4.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

ASM 10.4.3 Ridge (Vented).jpg

Click below for a printable version of this page (N/A)
Print Sheet


1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) 'Ventilation beneath panels
Required on slopes less than 1:3 (4” in 12”), beneath curved panel systems, and recommended when the roof slope exceeds 1:3 (4” in 12”).
(3) Architectural metal panel clip
When a ventilation material is specified or required (Item 2), clips must be supported on an EPDM pad (not illustrated) or supported according to the standards in 8.3.3 Separation and Ventilation Layers.
(4) & (5) Architectural metal roof panel
Top end of panels must be "bread-panned (5).
(6) Drag-load fasteners
Compatible non-corrosive fasteners.
(7) Sealant
(8) 'Z' Closure
Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
(9) Ventilation screen
(10) Ridge cap flashing
Hooked onto ventilation screen.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
Installed with ventilation gap at peak.

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.