Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"
Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"
(→WORK INCLUDED) |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
− | { | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} |
− | | | + | __NOTOC__ |
− | + | ||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>ASM | Cylindrical Penetration (Split Panel Flashing) ([[ASM_Roof_Systems_Standard#12.3.1.2._RoofStar_15-Year_Guarantee | Article 12.3.1.2.]] and [[ASM_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''ASM Details'''</big></div> | <div class="panel-heading"><big>'''ASM Details'''</big></div> | ||
Line 9: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:8.1.4.9.1.jpg|class=img-responsive]] | + | [[File:8.1.4.9.1.jpg| link=http://rpm.rcabc.org/images/a/ab/ASM_11.1.2_Pipe_Flashing%2C_Split_Panel.jpg | class=img-responsive]] |
</div> | </div> | ||
Line 19: | Line 23: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[ASM Roof Systems Standard#PART_5|'''Deck overlay''']]: Required for continuous support of the underlayment when the deck is not suitable. |
− | ;(2) [[ | + | ;(2) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment''']]: The type of underlay required is determined by roof slope. |
− | ;(3) [[ | + | ;(3) [[ASM Roof Systems Standard#PART_7|'''Insulation''']]: Offset and stagger layers 300 mm (12"). |
− | ;(4) [[ | + | ;(4) [[ASM Roof Systems Standard#8.1.3.4. Separation Between Materials|'''Vapour-permeable separation membrane''']]: Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels/ventilation material. |
− | ;(5) [[ | + | ;(5) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventilation beneath panels''']]: A ventilation/drying space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation/drying space facilitates drying as condensation forms on the underside of the metal panels (See [[Notes to ASM Standard#A-8.1.3.5. | Note A-8.1.3.5.]]). |
− | ;(6) [[ | + | ;(6) [[ASM Roof Systems Standard#9.2.1.6. Bearing Plates and EPDM Pads|'''Bearing plate''']]: Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips. |
− | ;(7) [[ | + | ;(7) [[ASM Roof Systems Standard#9.2.1.5.Clips |'''Architectural metal panel clip''']] |
− | ;(8) [[ | + | ;(8) [[ASM Roof Systems Standard#PART_9|'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe. |
;(9) Overlap area of lower panel: Penetration flashing is mounted here, set in an acceptable sealant. | ;(9) Overlap area of lower panel: Penetration flashing is mounted here, set in an acceptable sealant. | ||
− | ;(10) '''Spaced Cleat''': Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws. | + | ;(10) [[ASM Roof Systems Standard#12.3.2.4. Curbs and Sleepers | '''Spaced Cleat''']]: Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws. |
− | ;(11) [[ | + | ;(11) [[ASM Roof Systems Standard#9.2.1.7. Sealants |'''Sealant''']] |
;(12) '''Architectural metal roof panel (upper)''': Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat. | ;(12) '''Architectural metal roof panel (upper)''': Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat. | ||
;(13) '''Protrusion Flashing''': Flange set in two continuous beads of accepted caulking. | ;(13) '''Protrusion Flashing''': Flange set in two continuous beads of accepted caulking. | ||
− | ;(14) [[ | + | ;(14) [[ASM Roof Systems Standard#9.2.1.7. Sealants |'''Sealant''']]: Applied around base of penetration flashing. |
;(15) '''Settlement Cap''': Material must match flashing material. | ;(15) '''Settlement Cap''': Material must match flashing material. | ||
Line 38: | Line 42: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[ASM Roof Systems Standard#PART_2|'''Acceptable Deck''']] |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
+ | [[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 17:35, 17 March 2023
Division D - Construction Details
ASM | Cylindrical Penetration (Split Panel Flashing) ( Article 12.3.1.2. and Article 12.3.2.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
ASM Details
1 WORK INCLUDED
- (1) Deck overlay
- Required for continuous support of the underlayment when the deck is not suitable.
- (2) Underlayment
- The type of underlay required is determined by roof slope.
- (3) Insulation
- Offset and stagger layers 300 mm (12").
- (4) Vapour-permeable separation membrane
- Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels/ventilation material.
- (5) Ventilation beneath panels
- A ventilation/drying space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation/drying space facilitates drying as condensation forms on the underside of the metal panels (See Note A-8.1.3.5.).
- (6) Bearing plate
- Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
- (7) Architectural metal panel clip
- (8) Architectural metal roof panel (lower)
- Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
- (9) Overlap area of lower panel
- Penetration flashing is mounted here, set in an acceptable sealant.
- (10) Spaced Cleat
- Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.
- (11) Sealant
- (12) Architectural metal roof panel (upper)
- Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
- (13) Protrusion Flashing
- Flange set in two continuous beads of accepted caulking.
- (14) Sealant
- Applied around base of penetration flashing.
- (15) Settlement Cap
- Material must match flashing material.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: See the Standard for additional requirements.
Back to ASM Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.