Difference between revisions of "Draft CD 11"
Difference between revisions of "Draft CD 11"
(→WORK INCLUDED) |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | = | + | |
− | = | + | |
− | = | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} |
− | =Main | + | __NOTOC__ |
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>PVC | Membrane Termination E (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''PVC Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | <br> | ||
+ | [[File:10.3.2.3.-PVC-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-PVC-E.png]] | ||
+ | :Drawing NTS | ||
+ | </div> | ||
+ | </div><!-- COL-6-MD --> | ||
+ | |||
+ | <div class="col-md-6"> | ||
+ | === WORK INCLUDED === | ||
+ | |||
+ | ;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: | ||
+ | :As specified by the ''Design Authority'' and installed to provide continuity for optimal control. | ||
+ | ;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]: | ||
+ | :Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction. | ||
+ | ;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]: | ||
+ | :Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels. | ||
+ | ;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]: | ||
+ | :See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3. | ||
+ | ;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]: | ||
+ | :Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened). | ||
+ | ;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]: | ||
+ | :Edge securement must be anchored to the roof structure to prevent membrane movement. | ||
+ | ;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]: | ||
+ | :Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered. | ||
+ | ;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]: | ||
+ | :May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate. | ||
+ | ;(9) [[PVC Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]: | ||
+ | :All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown. | ||
+ | ;(10) [[PVC Roof Systems Standard#PART_10|<big>Surface Reglet Counter-flashing and Sealant</big>]]: | ||
+ | :Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage. | ||
+ | |||
+ | === RELATED WORK BY OTHERS === | ||
+ | ;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]] | ||
+ | :Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions. | ||
+ | ;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]] | ||
+ | :Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions. | ||
+ | |||
+ | </div><!-- COL-6-MD --> | ||
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
+ | |||
+ | '''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements. | ||
+ | |||
+ | <hr> | ||
+ | |||
+ | [[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']] | ||
+ | |||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
+ | |||
+ | {{Template:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 15:24, 16 February 2024
Division D - Construction Details
PVC | Membrane Termination E (Wall) ( Article 10.3.2.3.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
PVC Details
1 WORK INCLUDED
- (1) Air/Vapour Control Layers
- As specified by the Design Authority and installed to provide continuity for optimal control.
- (2) Insulation
- Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
- (3) Insulation Overlay Panel
- Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.
- (4) Field Membrane
- See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.
- (5) Edge Securement
- Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
- (6) Mechanical Fastening
- Edge securement must be anchored to the roof structure to prevent membrane movement.
- (7) Primer or Adhesive
- Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.
- (8) Membrane Flashing
- May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the finished roof system surface, plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
- (9) Membrane Edge Securement and Sealant
- All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.
- (10) Surface Reglet Counter-flashing and Sealant
- Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- Illustrated deck is representative. See Sub-section 2.1.5. for acceptable deck types and conditions.
- (B) Wall Structure
- Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap roofing system to achieve continuity. See Sub-section 2.1.7. for wall conditions.
NOTE: See the PVC Roof Systems Standard for additional requirements.
Back to PVC Roof System Details
© RCABC 2024