Difference between revisions of "EPDM Roof System Details"
Difference between revisions of "EPDM Roof System Details"
(→Part 12 - Penetrations and Curbs) |
(→Doors, Windows, and Wall Openings ( Article 10.3.4.5.)) |
||
| Line 75: | Line 75: | ||
====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])===== | ====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])===== | ||
<ol> | <ol> | ||
| − | <li>[[EPDM Low Door Opening | {{hilite | Low Door Opening || | + | <li>[[EPDM Low Door Opening | {{hilite | Low Door Opening || 2026-October-31 }}]] |
<li>[[EPDM Window Opening | Window Opening]] - Under construction | <li>[[EPDM Window Opening | Window Opening]] - Under construction | ||
</li></ol> | </li></ol> | ||
Revision as of 15:54, 7 November 2025
- Division D - Construction Details
- Construction Details for EPDM Membrane Roof Systems
- The drawings linked on this page are intended to represent a variety of EPDM Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about EPDM Membrane System designs and requirements, see the Standard for EPDM Membrane Roof Systems.
Part 1 - General
Permitted Roof Systems ( Article 1.1.3.1.)
- Conventionally Insulated System (Typical)
- Conventionally Insulated System (Alternate)
- Protected Roof Assembly (Typical)
Part 6 - Air and Vapour Controls
Continuity and Support ( Article 6.3.2.1.)
Part 10 - Perimeters and Walls
General Application ( Article 10.3.2.3.)
- Membrane Termination A
- Membrane Termination B
- Membrane Termination C
- Membrane Termination D
- Membrane Termination E
- Membrane Termination F
Parapets ( Article 10.3.4.1.)
- Parapet (Typical) - Under construction
- Parapet (Independent of Roof Structure) - Under construction
- Tall Parapet - Under construction
- Parapet-Wall Connection - Under construction
Low-profile Edges ( Article 10.3.4.2.)
Part 10 (continued)
Fire Separations ( Article 10.3.4.4.)
- Fire Separation Joint - Under construction
- Fire Separation Wall - Under construction
Doors, Windows, and Wall Openings ( Article 10.3.4.5.)
- Low Door Opening
- Window Opening - Under construction
Expansion Joints ( Article 10.3.6.1.)
- Expansion Joint (Wall) - Under construction
- Expansion Joint (Field) - Under construction
Control Joints (Roof Dividers) ( Article 10.3.6.2.)
- Control Joint (Roof Divider) - Under construction
Part 11 - Drainage
Cast-iron Roof Drains ( Article 11.3.3.2.)
- Cast Iron Drains - Under construction
Flanged Insert-type Roof Drains ( Article 11.3.3.6.)
- Flanged Insert Drain - Under construction
- Flanged Insert Drain (Clamping Ring) - Under construction
Scuppers and Overflows ( Article 11.3.3.7.)
- Open-wall Scupper Drain - Under construction
- Through-wall Scupper Drain - Under construction
Part 12 - Penetrations and Curbs
Flashing Penetrations ( Article 12.3.2.1.)
- Plumbing Vent (Conventional Roof System)
- 2-Part Retrofit Flashing (Cable Penetration) - Under construction
- Fall Protection Anchor in Roof - Under construction
- Fall Protection Anchor in Wall - Under construction
- Fall Protection Anchor in Wall (Protected Roof System) - Under construction
Curbs, Sleepers, and Equipment Pads ( Article 12.3.2.4.)
- Basic Curb - Under construction
- Curb for Multiple Penetrations - Under construction
- Mechanical Equipment Curb - Under construction
- Equipment Sleeper - Under construction
Railings, Ladders, and Other Attached Structures ( Article 12.3.2.7.)
- Railing - Under construction
Sealant Pockets ( Article 12.3.2.8.)
- Sealant Pocket - Under construction
Part 13 - Linear Metal Flashing
- See the separate page, Construction Details for Linear Metal Flashings
Part 14 - The Roof as a Platform
Standard for EPDM Membrane Roof Systems
© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.