Difference between revisions of "ASM Membrane Gutter (Design Elements)"
Difference between revisions of "ASM Membrane Gutter (Design Elements)"
(→WORK INCLUDED) |
|||
(15 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | { | + | {{Template:RPM Info}} |
− | | | + | |
− | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>ASM | Membrane Gutter (Design Elements) ([[ASM_Roof_Systems_Standard#11.1.4.3.._Membrane_Gutters | Article 11.1.4.3.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''ASM Details'''</big></div> | <div class="panel-heading"><big>'''ASM Details'''</big></div> | ||
Line 7: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File: | + | [[File:ASM 12.1.1 Built-in Gutter (Design).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/3/3b/ASM_12.1.1_Built-in_Gutter_%28Design%29.jpg]] |
+ | </div> | ||
+ | |||
+ | ::Click below for a printable version of this page (N/A) | ||
+ | |||
+ | <div style="width:150px; text-align: left;"> | ||
+ | :[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/5/52/D1.7.6-3_Print_Sheet.pdf|'''Print Sheet''']] | ||
</div> | </div> | ||
+ | |||
+ | |||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) '''Membranes''': Membranes must be installed to ''RoofStar Guarantee Standards'' and the manufacturer's printed instructions | + | ;(1) '''Membranes''': Membranes must be installed to '''''RoofStar Guarantee Standards''''' and the manufacturer's printed instructions ({{hilite | NOTE: Fasteners shall be installed 152.4 mm (6”) or more above the maximum water line, and gutters must include a scupper overflow drain. || 2017-April-22 }}). |
;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c | ;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c | ||
− | ;(3) '''Height''': The minimum vertical sealed height above the maximum water level is | + | ;(3) '''Height''': The minimum vertical sealed height above the maximum water level is 152.4 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions. Built-in gutter membranes can be extended to act as eave protection for the adjoining roof system. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 203.2 mm (8") and be installed in shingle fashion (not shown for clarity). |
− | + | ;(4) Metal cap flashing | |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) '''Dimension''': Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority | + | ;(A) [[ASM Roof Systems Standard#ASMDECK|'''Acceptable Deck''']] |
− | + | ;(B) '''Dimension''': Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority | |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
+ | [[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']] | ||
+ | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
− | |||
− | |||
− | |||
− |
Latest revision as of 16:01, 18 March 2024
Division D - Construction Details
ASM | Membrane Gutter (Design Elements) ( Article 11.1.4.3.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
ASM Details
1 WORK INCLUDED
- (1) Membranes
- Membranes must be installed to RoofStar Guarantee Standards and the manufacturer's printed instructions (NOTE: Fasteners shall be installed 152.4 mm (6”) or more above the maximum water line, and gutters must include a scupper overflow drain.).
- (2) Adhesion
- Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c
- (3) Height
- The minimum vertical sealed height above the maximum water level is 152.4 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions. Built-in gutter membranes can be extended to act as eave protection for the adjoining roof system. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 203.2 mm (8") and be installed in shingle fashion (not shown for clarity).
- (4) Metal cap flashing
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Dimension
- Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority
NOTE: See the Standard for additional requirements.
Back to ASM Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.