Difference between revisions of "ASM Eave and Rake Edges (Zinc)"
Difference between revisions of "ASM Eave and Rake Edges (Zinc)"
m (James Klassen moved page ASM Details:E1.7.19 (Zinc Standing Seam Systems Eave & Gable Flashing) to ASM 10.1.4 Eave and Rake Flashing (Zinc)) |
|||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | {{Template:RPM Info}} | |
− | + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | |
+ | __NOTOC__ | ||
+ | |||
+ | <big><big>Division D - Construction Details</big></big> | ||
+ | <hr> | ||
+ | <big><big><big><big><big>ASM | Eave and Rake Edges (Zinc) ([[ASM_Roof_Systems_Standard#10.3.2.3. General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]] and [[ASM_Roof_Systems_Standard#10.3.4.2. Eaves and Rake Edges | Article 10.3.4.2.]])</big></big></big></big></big> | ||
+ | {{Template:Construction Details Header}} | ||
− | |||
− | |||
− | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
− | <div class="panel-heading"><big>''' | + | <div class="panel-heading"><big>'''SBS Details'''</big></div> |
<div class="panel-body"> | <div class="panel-body"> | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File: | + | [[File:ASM 10.1.4 Eave and Rake Flashing (Zinc).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/b/b3/ASM_10.1.4_Eave_and_Rake_Flashing_%28Zinc%29.jpg]] |
</div> | </div> | ||
+ | |||
+ | |||
+ | ::Click below for a printable version of this page (N/A) | ||
+ | |||
+ | <div style="width:150px; text-align: left;"> | ||
+ | :[[File:Pdf.png|100 px|link=|'''Print Sheet''']] | ||
+ | </div> | ||
+ | |||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
− | |||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) | + | ;(1) [[ASM Roof Systems Standard#8.1.3.4. Separation Between Materials | '''Separation membrane''']]: Separates the deck and the metal edge flashing. |
− | ;(2) [[ | + | ;(2) [[ASM Roof Systems Standard#10.3.4.2. Eaves and Rake Edges | '''Hook securement strip''']]: In this particular rake edge configuration, a similar strip is installed along the rake to secure the flush rake-edge flashing. |
− | ;(3) ''' | + | ;(3) [[ASM Roof Systems Standard#10.3.4.2. Eaves and Rake Edges | '''Continuous eave metal flashing''']]: |
− | ;(4) | + | ;(4) [[ASM Roof Systems Standard#8.1.3.1. Eave Protection|'''Eave protection''']]: One ply of self-adhered modified bituminous underlayment material. Lap 50 mm (2") minimum on sides and 100 mm (4") minimum on ends. |
− | ;(5) ''' | + | ;(5) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment''']]: Applicable for all Architectural Sheet Metal systems. For slopes less than 1:3, the entire roof slope must be covered with a <u>self-adhered</u> underlayment. |
− | ;( | + | ;(6) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventilation beneath panels''']]: A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels. |
+ | ;(7) [[ASM Roof Systems Standard#9.2.1.5.Clips|'''Metal panel clip''']]: Installed in keeping with the metal roof panel manufacturer's printed instructions. Install on EPDM pad (not shown) or use a tall clip sized to support the panel on top of the ventilation layer. | ||
+ | ;(8) [[ASM Roof Systems Standard#10.3.4.2. Eaves and Rake Edges | '''Flush rake-edge flashing''']]: Note that panel hooks onto outside edge of flashing, which is mechanically secured to the roof deck. | ||
+ | ;(9) [[ASM Roof Systems Standard#PART_9 |'''Architectural metal roof panel''']] | ||
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[ASM Roof Systems Standard#PART_2|'''Acceptable deck''']] |
− | ;(B) '''Fascia Board''' | + | ;(B) '''Fascia Board''' |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements. |
− | |||
<hr> | <hr> | ||
+ | [[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Latest revision as of 18:24, 28 June 2022
Division D - Construction Details
ASM | Eave and Rake Edges (Zinc) ( Article 10.3.2.3. and Article 10.3.4.2.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Separation membrane
- Separates the deck and the metal edge flashing.
- (2) Hook securement strip
- In this particular rake edge configuration, a similar strip is installed along the rake to secure the flush rake-edge flashing.
- (3) Continuous eave metal flashing
- (4) Eave protection
- One ply of self-adhered modified bituminous underlayment material. Lap 50 mm (2") minimum on sides and 100 mm (4") minimum on ends.
- (5) Underlayment
- Applicable for all Architectural Sheet Metal systems. For slopes less than 1:3, the entire roof slope must be covered with a self-adhered underlayment.
- (6) Ventilation beneath panels
- A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
- (7) Metal panel clip
- Installed in keeping with the metal roof panel manufacturer's printed instructions. Install on EPDM pad (not shown) or use a tall clip sized to support the panel on top of the ventilation layer.
- (8) Flush rake-edge flashing
- Note that panel hooks onto outside edge of flashing, which is mechanically secured to the roof deck.
- (9) Architectural metal roof panel
2 RELATED WORK BY OTHERS
- (A) Acceptable deck
- (B) Fascia Board
NOTE: See the Standard for additional requirements.
Back to ASM Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.