Difference between revisions of "TPO Metal Edge Termination"
Difference between revisions of "TPO Metal Edge Termination"
(Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>...") |
(→WORK INCLUDED) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
<big><big>Division D - Construction Details</big></big> | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | <big><big><big><big><big> | + | <big><big><big><big><big>TPO | Metal Edge Termination</big></big></big></big></big> |
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''Notice to Reader'''''</big> | | colspan="2" | <big>'''''Notice to Reader'''''</big> | ||
Line 26: | Line 26: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOVAPOUR|'''Vapour Retarder''']]: If required by design authority. | ;(1) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOVAPOUR|'''Vapour Retarder''']]: If required by design authority. | ||
− | ;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOINSULATION|'''Insulation''']]: Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[ | + | ;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOINSULATION|'''Insulation''']]: Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Division C|'''Accepted Materials''']] Division of this Manual. |
;(3) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards) | ;(3) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards) | ||
;(4) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer’s instructions and RoofStar Guarantee Standards. | ;(4) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer’s instructions and RoofStar Guarantee Standards. |
Latest revision as of 18:24, 21 September 2022
Division D - Construction Details
TPO | Metal Edge Termination
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
TPO / PVC Details
1 WORK INCLUDED
- (1) Vapour Retarder
- If required by design authority.
- (2) Insulation
- Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials Division of this Manual.
- (3) Adhesive
- Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards)
- (4) Single-ply Membrane
- Installed according to manufacturer’s instructions and RoofStar Guarantee Standards.
- (5) Membrane Lap
- Thermoplastic membrane may be welded or chemically bonded.
- (6) Edge Flashing
- Proprietary, coated with membrane material and heat-welded to the primary (field) membrane
- (7) Fascia Flashing Clip
- Affixed to the fascia material (installed by others) with fasteners O.C. 300 mm (12”)
- (8) Fascia Flashing
- Manufactured to RoofStar Guarantee Standards for sheet metal flashings
- (9) Membrane Flashing
- Adhered according to manufacturer’s printed specifications using proprietary adhesive. Must be carried to the outside of the parapet or vertically to a minimum of 200 mm (8”) above the finished roof surface. Welded or adhered to primary membrane depending on membrane type.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Edge Blocking
- (D) Fascia Material
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for TPO/PVC Roof Assemblies