Difference between revisions of "EPDM Roof System Details"

Jump to: navigation, search

Difference between revisions of "EPDM Roof System Details"

(Part 10 - Perimeters and Walls)
 
(One intermediate revision by the same user not shown)
Line 26: Line 26:
 
====='''Permitted Roof Systems''' ([[EPDM_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])=====
 
====='''Permitted Roof Systems''' ([[EPDM_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])=====
 
<ol>
 
<ol>
:[[EPDM Conventionally Insulated System (Typical)| Conventionally Insulated System (Typical)]]
+
<li>[[EPDM Conventionally Insulated System (Typical)| Conventionally Insulated System (Typical)]]
:[[EPDM Conventionally Insulated System (Alternate) | Conventionally Insulated System (Alternate)]]
+
<li>[[EPDM Conventionally Insulated System (Alternate) | Conventionally Insulated System (Alternate)]]
:[[EPDM Protected Roof Assembly (Typical)  | Protected Roof Assembly (Typical)]]
+
<li>[[EPDM Protected Roof Assembly (Typical)  | Protected Roof Assembly (Typical)]]
 
</li></ol>
 
</li></ol>
  
Line 34: Line 34:
 
====='''Continuity and Support''' ([[EPDM_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])=====
 
====='''Continuity and Support''' ([[EPDM_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])=====
 
<ol>
 
<ol>
:[[EPDM Air and Vapour Controls (Field) | {{hilite | Air and Vapour Controls (Field)|| 2021-February-7 }}]]
+
<li>[[EPDM Air and Vapour Controls (Field) | {{hilite | Air and Vapour Controls (Field)|| 2021-February-7 }}]]
 
</li></ol>
 
</li></ol>
  
Line 43: Line 43:
  
 
===Part 10 - Perimeters and Walls===
 
===Part 10 - Perimeters and Walls===
 +
====='''General Application''' ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])=====
 +
<ol>
 +
<li>[[EPDM Membrane Termination A | Membrane Termination A]]
 +
<li>[[EPDM Membrane Termination B | Membrane Termination B]]
 +
<li>[[EPDM Membrane Termination C | Membrane Termination C]]
 +
<li>[[EPDM Membrane Termination D | Membrane Termination D]]
 +
<li>[[EPDM Membrane Termination E | Membrane Termination E]]
 +
<li>[[EPDM Membrane Termination F | Membrane Termination F]]
 +
</li></ol>
  
 
===Part 11 - Drainage===
 
===Part 11 - Drainage===

Latest revision as of 16:30, 26 February 2024



Division D - Construction Details

Construction Details for EPDM Membrane Roof Systems
EPDM Roof Systems.jpg
The drawings linked on this page are intended to represent a variety of EPDM Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about EPDM Membrane System designs and requirements, see the Standard for EPDM Membrane Roof Systems.

Part 12 - Penetrations and Curbs

Part 13 - Linear Metal Flashing

See the separate page, Construction Details for Linear Metal Flashings.

Part 14 - The Roof as a Platform


Standard for EPDM Membrane Roof Systems

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.