Difference between revisions of "ASM Membrane Gutter (Design Elements)"
Difference between revisions of "ASM Membrane Gutter (Design Elements)"
(→WORK INCLUDED) |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
<big><big>Division D - Construction Details</big></big> | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | <big><big><big><big><big>ASM | Membrane Gutter (Design Elements) ([[ASM_Roof_Systems_Standard# | + | <big><big><big><big><big>ASM | Membrane Gutter (Design Elements) ([[ASM_Roof_Systems_Standard#11.1.4.3.._Membrane_Gutters | Article 11.1.4.3.]])</big></big></big></big></big> |
{{Template:Construction Details Header}} | {{Template:Construction Details Header}} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
Line 27: | Line 27: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) '''Membranes''': Membranes must be installed to '''''RoofStar Guarantee Standards''''' and the manufacturer's printed instructions ({{hilite | NOTE: Fasteners shall be installed | + | ;(1) '''Membranes''': Membranes must be installed to '''''RoofStar Guarantee Standards''''' and the manufacturer's printed instructions ({{hilite | NOTE: Fasteners shall be installed 152.4 mm (6”) or more above the maximum water line, and gutters must include a scupper overflow drain. || 2017-April-22 }}). |
;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c | ;(2) '''Adhesion''': Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c | ||
− | ;(3) '''Height''': The minimum vertical sealed height above the maximum water level is | + | ;(3) '''Height''': The minimum vertical sealed height above the maximum water level is 152.4 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions. Built-in gutter membranes can be extended to act as eave protection for the adjoining roof system. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 203.2 mm (8") and be installed in shingle fashion (not shown for clarity). |
;(4) Metal cap flashing | ;(4) Metal cap flashing | ||
Latest revision as of 16:01, 18 March 2024
Division D - Construction Details
ASM | Membrane Gutter (Design Elements) ( Article 11.1.4.3.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
ASM Details
1 WORK INCLUDED
- (1) Membranes
- Membranes must be installed to RoofStar Guarantee Standards and the manufacturer's printed instructions (NOTE: Fasteners shall be installed 152.4 mm (6”) or more above the maximum water line, and gutters must include a scupper overflow drain.).
- (2) Adhesion
- Membranes must be fully adhered, where exposed, and mechanically fastened at terminations 300 mm (12") o/c
- (3) Height
- The minimum vertical sealed height above the maximum water level is 152.4 mm (6"). The membrane run up the slope will vary with roof pitch. Increase height in heavy snow regions. Built-in gutter membranes can be extended to act as eave protection for the adjoining roof system. Underlay or eave protection membrane must overlap built-in gutter membrane by a minimum of 203.2 mm (8") and be installed in shingle fashion (not shown for clarity).
- (4) Metal cap flashing
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Dimension
- Dimensions of parapets, cants and water loading of gutters are variable and should be determined by design authority
NOTE: See the Standard for additional requirements.