Difference between revisions of "ASM Valley (Hooked)"

Jump to: navigation, search

Difference between revisions of "ASM Valley (Hooked)"

 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>ASM | Valley (Hooked) ([[ASM_Roof_Systems_Standard#10.3.5.2. General Requirements for Valley Metal Flashing | Article 10.3.2.2.]] and [[ASM_Roof_Systems_Standard#10.3.5.3. Hooked Metal Valleys | Article 10.3.5.3.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''ASM Details'''</big></div>
 
<div class="panel-heading"><big>'''ASM Details'''</big></div>
 
<div class="panel-body">
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div class="col-md-6">
<div style="vertical-align:center">
+
<div style="text-align:center; vertical-align:center">
[[File:8.1.4.5.1.jpg|class=img-responsive|class=img-rounded]]
+
[[File:ASM 10.3.1 Hooked Valley Flashing.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/b/bb/ASM_10.3.1_Hooked_Valley_Flashing.jpg]]
 +
</div>
 +
 
 +
::Click below for a printable version of this page (N/A)
 +
 
 +
<div style="width:150px; text-align: left;">
 +
:[[File:Pdf.png|100 px|link=|'''Print Sheet''']]
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 10: Line 26:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALLEYMEM |'''Valley Protection Membrane''']]: Accepted self-adhered modified bituminous eave protection membrane.
+
;(1) [[ASM Roof Systems Standard#8.1.3.2. Valley Protection |'''Valley Protection Membrane''']]: Accepted self-adhered modified bituminous eave protection membrane.
;(2) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
+
;(2) [[ASM Roof Systems Standard#10.1.5.2. Valley Flashing |'''Valley flashing''']]
;(3) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
+
;(3) [[ASM Roof Systems Standard#10.3.5.2. General Requirements for Valley Metal Flashing |'''Fastening''']]: Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5"). See '''10.3.5.2.2''' ('''5''').
;(4) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALLEYPAN |'''Valley Metal Panel''']]: Preformed with centre rib and built-in continuous lock. 
+
;(4) [[ASM Roof Systems Standard#10.3.5.3. Hooked Metal Valleys |'''Valley panel overlap''']]: Overlaps minimum 200 mm (8") sealed with two rows of acceptable sealant or butyl tape, and secured with drag load fasteners.
;(5) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMFASTENING |'''Fastening''']]: Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").  
+
;(5) [[ASM Roof Systems Standard#10.3.5.2. General Requirements for Valley Metal Flashing|'''Membrane flashing''']]: Accepted self-adhered modified bituminous eave protection membrane.
;(6) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMICE|'''Membrane Strip-in''']]: Accepted self-adhered modified bituminous eave protection membrane.  
+
;(6) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment''']]: The type of underlay required is determined by roof slope.
;(7) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMPANEL |'''Architectural Metal Roof Panel''']]  
+
;(7) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventilation beneath panels''']]:  A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
;(8) '''Continuous Built-In Hook Strip'''
+
;(8) [[ASM Roof Systems Standard#PART_9 |'''Architectural metal roof panel''']]
;(9) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALOVERLAP |'''Valley Panel Overlap''']]: Set in two continuous rows of accepted caulking or sealant tape.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDECK|'''Acceptable Deck''']]
+
;(A) [[ASM Roof Systems Standard#PART_2|'''Acceptable Deck''']]
 
</div><!-- COL-LG-6 -->
 
</div><!-- COL-LG-6 -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Application'']]
 
 
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 

Latest revision as of 18:24, 28 June 2022



Division D - Construction Details


ASM | Valley (Hooked) ( Article 10.3.2.2. and Article 10.3.5.3.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

ASM Details

ASM 10.3.1 Hooked Valley Flashing.jpg

Click below for a printable version of this page (N/A)
Print Sheet

1 WORK INCLUDED

(1) Valley Protection Membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Valley flashing
(3) Fastening
Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5"). See 10.3.5.2.2 (5).
(4) Valley panel overlap
Overlaps minimum 200 mm (8") sealed with two rows of acceptable sealant or butyl tape, and secured with drag load fasteners.
(5) Membrane flashing
Accepted self-adhered modified bituminous eave protection membrane.
(6) Underlayment
The type of underlay required is determined by roof slope.
(7) Ventilation beneath panels
A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
(8) Architectural metal roof panel

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.