Difference between revisions of "Asphalt Shingle System Details"
Difference between revisions of "Asphalt Shingle System Details"
Line 1: | Line 1: | ||
:[[AS Details:E2.7.1 (Shingle Application - All Slopes)|E2.7.1 Shingle Application - All Slopes]] | :[[AS Details:E2.7.1 (Shingle Application - All Slopes)|E2.7.1 Shingle Application - All Slopes]] | ||
:[[AS Details:E2.7.1 (Low Slope Shingle Application)|E2.7.1 Low Slope Shingle Application]] | :[[AS Details:E2.7.1 (Low Slope Shingle Application)|E2.7.1 Low Slope Shingle Application]] | ||
+ | :[[AS Details:E2.7.2 (Low Slope Shingle Application)|E2.7.2 Low Slope Shingle Application]] | ||
:[[AS Details:E2.7.3 (Open Valley)|E2.7.3 Open Valley]] | :[[AS Details:E2.7.3 (Open Valley)|E2.7.3 Open Valley]] | ||
:[[AS Details:E2.7.4 (Closed Cut Valley)|E2.7.4 Closed Cut Valley]] | :[[AS Details:E2.7.4 (Closed Cut Valley)|E2.7.4 Closed Cut Valley]] |
Revision as of 22:52, 21 December 2015
- E2.7.1 Shingle Application - All Slopes
- E2.7.1 Low Slope Shingle Application
- E2.7.2 Low Slope Shingle Application
- E2.7.3 Open Valley
- E2.7.4 Closed Cut Valley
- E2.7.5 Woven Valley
- E2.7.6 Upper Junction Detail - Asphalt Shingle at BUR
- E2.7.7 Lower Junction Detail - Asphalt Shingle at BUR
- E2.7.8 Eave Detail - All Slopes
- E2.7.1 Chimney Flashing Detail
- E2.7.10 Lead Vent - Typical
- E2.7.11 Counter-flashing - Diverter Flashing
- E2.7.12 Integral Flashing with Capillary Table