Difference between revisions of "ASM 10.4.3 Ridge (Vented)"
Difference between revisions of "ASM 10.4.3 Ridge (Vented)"
Line 6: | Line 6: | ||
<big><big>Division D - Construction Details</big></big> | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | <big><big><big><big><big>ASM 10.4.3 | + | <big><big><big><big><big>ASM | Ridge (Vented, Uninsulated) ([[ASM_Roof_Systems_Standard#10.3.2.3. General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]] and [[ASM_Roof_Systems_Standard#10.3.4.1. Ridges | Article 10.3.4.1.]])</big></big></big></big></big> |
− | { | + | {{Template:Construction Details Header}} |
− | |||
− | |||
− | |||
− | |||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> |
Latest revision as of 16:23, 28 June 2022
Division D - Construction Details
ASM | Ridge (Vented, Uninsulated) ( Article 10.3.2.3. and Article 10.3.4.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Underlayment
- The type of underlay required is determined by roof slope.
- (2) Separation layer
- Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels (see 8.1.2 Design).
- (3) Architectural metal panel clip
- When a ventilation material is specified or required (Item 2), clips must be supported on an EPDM pad (not illustrated) or supported according to the standards in 8.3.3 Separation and Ventilation Layers.
- (4) & (5) Architectural metal roof panel
- Top end of panels must be "bread-panned (5).
- (6) Drag-load fasteners
- Compatible non-corrosive fasteners.
- (7) Sealant
- (8) 'Z' Closure
- Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
- (9) Ventilation screen
- (10) Ridge cap flashing
- Hooked onto ventilation screen.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- Installed with ventilation gap at peak.
NOTE: See the Standard for additional requirements.
Back to ASM Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.