Difference between revisions of "SBS Roof System Details"

Jump to: navigation, search

Difference between revisions of "SBS Roof System Details"

Line 27: Line 27:
 
:[[SBS Details:D1.7.5-2 Roof-Wall Transitions (Divider/Joint)|D1.7.5-2 Roof-Wall Transitions (Divider/Control Joint)]]
 
:[[SBS Details:D1.7.5-2 Roof-Wall Transitions (Divider/Joint)|D1.7.5-2 Roof-Wall Transitions (Divider/Control Joint)]]
 
:[[SBS Details:D1.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D1.7.5-3 Roof-Wall Transitions (Fire Separation Joint)]]
 
:[[SBS Details:D1.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D1.7.5-3 Roof-Wall Transitions (Fire Separation Joint)]]
:[[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|D1.7.19 Roof-Wall Transitions (Fire Separation Wall)]]
+
:[[SBS Details:D1.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D1.7.5-4 Roof-Wall Transitions (Fire Separation Wall)]]
  
 
:[[SBS Details:D1.7.20 Curbs & Sleepers (Equipment Sleeper)|D1.7.20 Curbs & Sleepers (Equipment Sleeper)]]
 
:[[SBS Details:D1.7.20 Curbs & Sleepers (Equipment Sleeper)|D1.7.20 Curbs & Sleepers (Equipment Sleeper)]]

Revision as of 18:09, 16 September 2016

The drawings contained within this section are intended to represent a variety of modified bituminous roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.

For further information about SBS membrane system design and requirements, see SBS Roof Systems.




Back to SBS Roof Systems

Back to Construction Details Section