ASM 10.4.3 Ridge (Vented)
ASM 10.4.3 Ridge (Vented)
Revision as of 14:39, 31 August 2021 by James Klassen (talk | contribs)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
SBS Details
1 WORK INCLUDED
- (1) Underlayment
- The type of underlay required is determined by roof slope.
- (2) Separation layer
- Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels (see 8.1.2 Design).
- (3) Architectural metal panel clip
- When a ventilation material is specified or required (Item 2), clips must be supported on an EPDM pad (not illustrated) or supported according to the standards in 8.3.3 Separation and Ventilation Layers.
- (4) & (5) Architectural metal roof panel
- Top end of panels must be "bread-panned (5).
- (6) Drag-load fasteners
- Compatible non-corrosive fasteners.
- (7) Sealant
- (8) 'Z' Closure
- Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
- (9) Ventilation screen
- (10) Ridge cap flashing
- Hooked onto ventilation screen.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- Installed with ventilation gap at peak.
NOTE: See the Standard for additional requirements.
Back to ASM Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.