ASM Valley (Hooked)

Jump to: navigation, search

ASM Valley (Hooked)

Revision as of 20:35, 7 September 2021 by James Klassen (talk | contribs)



Division D - Construction Details


ASM 10.3.1 Hooked Valley Flashing

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
ASM Details

ASM 10.3.1 Hooked Valley Flashing.jpg

Click below for a printable version of this page (N/A)
Print Sheet

1 WORK INCLUDED

(1) Valley Protection Membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Valley flashing
(3) Fastening
Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5"). See 10.3.5.2.2 (5).
(4) Valley panel overlap
Overlaps minimum 200 mm (8") sealed with two rows of acceptable sealant or butyl tape, and secured with drag load fasteners.
(5) Membrane flashing
Accepted self-adhered modified bituminous eave protection membrane.
(6) Underlayment
The type of underlay required is determined by roof slope.
(7) Ventilation layer
A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
(8) Architectural metal roof panel

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.