Materials:(Transwest) FF 100
Materials:(Transwest) FF 100
Revision as of 22:45, 1 December 2016 by James Klassen (talk | contribs)
Manufacturer: TRANSWEST ROOFING LTD.
Contact Address: See the current Membership list and contact information at www.rcabc.org
Product Group: SEAM METAL ROOF SYSTEM - FF100 PANEL
- DESCRIPTION
The FF100 Panel is a metal roof panel formed from 24 gauge. The panel can be applied on to solid sheeting with or without insulation. Width from 300 mm (12") to 500 mm (20") wide with a 25 mm (1") height at the male rib. Panels are continuous with no end laps.
Fasteners (screws) used to attach panels to plywood deck to be No. 8 by 22 mm (1") panhead. Fasteners to be placed a maximum of 600 mm (24") on center.
- PART 1 - GENERAL
- 1.1 The roofing assembly / material information published in the RCABC Roofing Practices Manual DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority.
- 1.2 SYSTEM DESCRIPTION
- .1 Metal panels employ a hidden fastening system for securement to a solid substrate. 1" Snap-Lock panels are produced with a nail strip to eliminate the use of clips and allows the panel seams to interlock without having to use a mechanical seaming device.
- .2 Range of application: on wood or metal sloped roofs; in commercial, institutional, industrial and residential construction; also used for roof replacement (retrofit) application.
- 1.3 DELIVERY, STORAGE AND HANDLING
- .1 Protect against damage and discoloration.
- .2 Handle panels with non-marring slings.
- .3 Do not bend panels.
- .4 Store panels above ground, with one end elevated for drainage.
- .5 Protect panels against standing water and condensation between adjacent surfaces.
- .6 If panels become wet, immediately separate sheets, wipe dry with clean cloth, allow to air dry.
- PART 2 - PRODUCTS
- 2.1 FABRICATION
- .1 Unless otherwise shown on drawings or specified herein, fabricate panels in continuous one piece lengths and fabricate flashings and accessories in longest practical lengths.
- .2 Roofing panels shall be factory formed. Field formed panels are not acceptable.
- 2.2 PERFORMANCE REQUIREMENTS
- .1 Wind Uplift Standards:
- National Research Council (NRC-CNRC) Report No.B1040 Wind Uplift Resistance of Metal Roofing. The NRC-CNRC Report No. B1040 test results confirm that an acceptable level of wind uplift resistance can be achieved with RGC Accepted Metal Panel Systems on typical roof designs over solid decking for most British Columbia geographical locations. Refer to Appendix II for calculations for typical roof wind uplift pressure requirements for buildings located in the Province of British Columbia.
- A simplified design procedure developed by NRC-CNRC for selecting wind pressure calculations for metal roof assemblies by region (location) and building height in the Province of British Columbia is provided in Section 8.1.5 to assist designers.
- RGC accepted metal panel systems shall be formed of steel conforming to one of the following material specifications, as applicable:
- ASTM Standard Specification A653 / A653M, Sheet Steel, Zinc-Coated (Galvanized) or Zinc-Iron Alloy Coated (Galvannealed) by the hot dip process, minimum Grade 33, with a design thickness of 24 gauge. (0.024") or greater and a minimum zinc coating designation Z275 (G-90).
- ASTM Standard Specification A792 / A792M, Steel Sheet, 55% Aluminum-Zinc Alloy-Coated by the Hot-Dip Process, minimum Grade 33, with a design thickness of 24 gauge (0.024") or greater and minimum coating designation AZ150.
- PART 3 - EXECUTION
- 3.1 EXAMINATION - EXISTING CONDITIONS
- .1 Verify that structural deck to receive panels is complete, in true plane, secure and otherwise properly prepared.
- .2 Prior to starting work, notify General Contractor about defects requiring correction.
- .3 Do not start work until conditions are satisfactory.
- 3.2 PREPARATION - FIELD MEASUREMENTS
- .1 Verify prior to fabrication.
- .2 If field measurements differ from drawing dimensions, notify Architect / Professional Engineer prior to fabrication.
- 3.3 PROTECTION
- .1 Treat, or isolate with protective material, any contacting surfaces of dissimilar materials to prevent electrolytic corrosion.