SBS Roof System Details
SBS Roof System Details
Revision as of 15:56, 15 August 2017 by James Klassen (talk | contribs) (James Klassen moved page SBS Construction Details to SBS Modified Bitumen Construction Details)
- The drawings contained within this section are intended to represent a variety of modified bituminous roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about SBS membrane system design and requirements, see SBS Modified Bitumen Roof Systems.
NOTE: 'PDF' shown after a file name below indicates a downloadable print sheet is available for Construction Details. Click on the detail link and look for the icon.
- D1.7.2-1 Parapets & Copings (Low Parapet - Wall Supported) PDF
- D1.7.2-2 Parapets & Copings (Low Parapet - Unsupported by Wall) PDF
- D1.7.2-3 Parapets & Copings (High Parapet - Wall Supported) PDF
- D1.7.2-4 Parapets & Copings (Parapet - Wall Transition) PDF
- D1.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported) PDF
- D1.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall) PDF
- D1.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)
- D1.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D1.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)
- D1.7.4-6 Counter-flashings & Reglets (Low Door Sill)
- D1.7.4-7 Counter-flashings & Reglets (Window Curb)
- D1.7.5-1 Roof-Wall Transitions (Expansion Joint)
- D1.7.5-2 Roof-Wall Transitions (Divider/Control Joint)
- D1.7.5-3 Roof-Wall Transitions (Fire Separation Joint)
- D1.7.5-4 Roof-Wall Transitions (Fire Separation Wall)