ASM Ridge (Unvented, Uninsulated)

Jump to: navigation, search

ASM Ridge (Unvented, Uninsulated)

Revision as of 17:27, 21 December 2015 by James Klassen (talk | contribs) (Created page with "File:8.1.4.11.1.jpg === RIDGE / HIP CAP FLASHING === ;WORK INCLUDED (1) <b>Underlayment</b>: The type of underlay required is determined by roof slope (see Section 8.1....")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

8.1.4.11.1.jpg

1 RIDGE / HIP CAP FLASHING

WORK INCLUDED

(1) Underlayment: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).

(2) Slip Sheet: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.

(3) Architectural Metal Roof Panel: Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.

(4) ‘Z’ Closure: Set in accepted caulking and secured with compatible non-corrosive, flathead fasteners.

OR

(5) Preformed Foam Closure: Set in accepted caulking.

(6) Metal Cap Flashing: Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under 12.7 mm (1/2"). Fastened to each standing seam with high domed gasketed cladding screws or hooked to ‘Z’ closures.

(7) Drag Load Fastening: Compatible non-corrosive fasteners.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

(B) Wood Nailer

NOTE: * Refer to RGC Guarantee Standards for additional requirements.



Back to Construction Details