Difference between revisions of "ASM 10.4.3 Ridge (Vented)"

Jump to: navigation, search

Difference between revisions of "ASM 10.4.3 Ridge (Vented)"

 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
<hr>
+
{{Template:RPM Info}}
[[File:8.1.4.13.1.jpg]]
 
  
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
  
=== WORK INCLUDED ===
+
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>ASM | Ridge (Vented, Uninsulated) ([[ASM_Roof_Systems_Standard#10.3.2.3. General Application Requirements for Perimeters and Walls | Article 10.3.2.3.]] and [[ASM_Roof_Systems_Standard#10.3.4.1. Ridges | Article 10.3.4.1.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:ASM 10.4.3 Ridge (Vented).jpg|class=img-responsive | link=http://rpm.rcabc.org/images/3/3d/ASM_10.4.3_Ridge_%28Vented%29.jpg]]
 +
</div>
  
(1) <b>Underlayment</b>: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).
+
::Click below for a printable version of this page (N/A)
  
(2) <b>Slip Sheet</b>: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
+
<div style="width:150px; text-align: left;">
 +
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/5/52/D1.7.6-3_Print_Sheet.pdf|'''Print Sheet''']]
 +
</div>
  
(3) <b>Architectural Metal Roof Panel</b>: Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.
 
  
(4) <b>Metal Panel Clip</b>: Installed to metal roof panel manufacturer&#8217;s printed instructions.
+
</div><!-- COL-MD-6 -->
  
(5) <b>&#8216;Z&#8217; Closure</b>: Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.  
+
<div class="col-md-6">
 
+
=== WORK INCLUDED ===
(6) <b>Perforated Metal Screen</b>
+
;(1) [[ASM Roof Systems Standard#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
 
+
;(2) [[ASM Roof Systems Standard#ASMSEP-VENT|'''Separation layer''']]: Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems.  The material must be located between the insulation and metal panels (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
(7) <b>Continuous Cleat</b>
+
;(3) [[ASM Roof Systems Standard#ASMCLIP |'''Architectural metal panel clip''']]: When a ventilation material is specified or required (Item 2), clips must be supported on an EPDM pad  (not illustrated) or supported according to the standards in [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Separation_and_Ventilation_Layers '''8.3.3 Separation and Ventilation Layers'''].
 
+
;(4) & (5) [[ASM Roof Systems Standard#ASMCLOSURE |'''Architectural metal roof panel''']]: Top end of panels must be "bread-panned (5).
(8) <b>Metal Cap Flashing</b>: Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under.
+
;(6) [[ASM Roof Systems Standard#ASMDRAG |'''Drag-load fasteners''']]: Compatible non-corrosive fasteners.
 +
;(7) [[ASM Roof Systems Standard#ASMSEALANT |'''Sealant''']]
 +
;(8) [[ASM Roof Systems Standard#ASMZ |''''Z' Closure''']]: Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
 +
;(9) Ventilation screen
 +
;(10) [[ASM Roof Systems Standard#ASMZ | '''Ridge cap flashing''']]: Hooked onto ventilation screen.
  
 +
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
 +
;(A) [[ASM Roof Systems Standard#ASMDECK|'''Acceptable Deck''']]: Installed with ventilation gap at peak.
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
(A) <b>Acceptable Deck</b>
+
'''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements.
 
 
(B) <b>Wood Nailer</b>
 
 
 
(C) <b>Air Space</b>: Determined by Design Authority.
 
 
 
NOTE: * Refer to <i>RGC Guarantee Standards</i> for additional requirements.  
 
  
 
<hr>
 
<hr>
  
 +
[[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Application'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 

Latest revision as of 16:23, 28 June 2022



Division D - Construction Details


ASM | Ridge (Vented, Uninsulated) ( Article 10.3.2.3. and Article 10.3.4.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

ASM 10.4.3 Ridge (Vented).jpg

Click below for a printable version of this page (N/A)
Print Sheet


1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Separation layer
Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels (see 8.1.2 Design).
(3) Architectural metal panel clip
When a ventilation material is specified or required (Item 2), clips must be supported on an EPDM pad (not illustrated) or supported according to the standards in 8.3.3 Separation and Ventilation Layers.
(4) & (5) Architectural metal roof panel
Top end of panels must be "bread-panned (5).
(6) Drag-load fasteners
Compatible non-corrosive fasteners.
(7) Sealant
(8) 'Z' Closure
Set in accepted sealant or butyl tape and secured with compatible non-corrosive flathead fasteners.
(9) Ventilation screen
(10) Ridge cap flashing
Hooked onto ventilation screen.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
Installed with ventilation gap at peak.

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.