Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"

Jump to: navigation, search

Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"

(WORK INCLUDED)
(WORK INCLUDED)
 
(19 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:RPM Info}}
| colspan="2| <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
 
|}
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>ASM | Cylindrical Penetration (Split Panel Flashing) ([[ASM_Roof_Systems_Standard#12.3.1.2._RoofStar_15-Year_Guarantee | Article 12.3.1.2.]] and [[ASM_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''ASM Details'''</big></div>
 
<div class="panel-heading"><big>'''ASM Details'''</big></div>
Line 7: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:8.1.4.9.1.jpg|class=img-responsive]]
+
[[File:8.1.4.9.1.jpg| link=http://rpm.rcabc.org/images/a/ab/ASM_11.1.2_Pipe_Flashing%2C_Split_Panel.jpg | class=img-responsive]]
 
</div>
 
</div>
  
 
+
<div style="width:150px; text-align: center;">
 
+
:[[File:Pdf.png|100 px|'''Print Sheet''']] Under Revision
::Click below for a printable version of this page.
 
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/6/6b/ASM_E1.7.9_%28Equipment_Support_Stand_-_Pipe_Flashing_Split_Panel_Detail%29.pdf]]
 
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 21: Line 23:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
+
;(1) [[ASM Roof Systems Standard#PART_5|'''Deck overlay''']]: Required for continuous support of the underlayment when the deck is not suitable.
;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.  
+
;(2) [[ASM Roof Systems Standard#8.1.3.3. Field Underlayment|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural Metal Roof Panel''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.  
+
;(3) [[ASM Roof Systems Standard#PART_7|'''Insulation''']]: Offset and stagger layers 300 mm (12").
;(4) '''Flashing''': Flange set in two continuous beads of accepted caulking.  
+
;(4) [[ASM Roof Systems Standard#8.1.3.4. Separation Between Materials|'''Vapour-permeable separation membrane''']]: Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems.  The material must be located between the insulation and metal panels/ventilation material.
;(5) '''Spaced Cleat''': Cleats, set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.  
+
;(5) [[ASM Roof Systems Standard#8.1.3.5. Ventilation Beneath Panels|'''Ventilation beneath panels''']]: A ventilation/drying space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill.  The ventilation/drying space facilitates drying as condensation forms on the underside of the metal panels (See [[Notes to ASM Standard#A-8.1.3.5. | Note A-8.1.3.5.]]).
;(6) '''Architectural Metal Roof Panel''': Upper, installed after installation of pipe flashing.  Cut hole for pipe penetration and turn panel end under to accommodate cleats.  
+
;(6) [[ASM Roof Systems Standard#9.2.1.6. Bearing Plates and EPDM Pads|'''Bearing plate''']]: Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
;(7) '''Settlement Cap''': Material must match flashing material.
+
;(7) [[ASM Roof Systems Standard#9.2.1.5.Clips |'''Architectural metal panel clip''']]
;(8) '''Caulking''': Bead of caulking tooled into transition between metal roof panel and flashing.  
+
;(8) [[ASM Roof Systems Standard#PART_9|'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
;(9) '''Sealant Tape''': Two rows of sealant tape or acceptable caulking.  
+
;(9) Overlap area of lower panel: Penetration flashing is mounted here, set in an acceptable sealant.
;(10) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMDRAG |'''Drag-load Fasteners''']]: Compatible non-corrosive fasteners.
+
;(10) [[ASM Roof Systems Standard#12.3.2.4. Curbs and Sleepers | '''Spaced Cleat''']]: Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.  
 +
;(11) [[ASM Roof Systems Standard#9.2.1.7. Sealants |'''Sealant''']]
 +
;(12) '''Architectural metal roof panel (upper)''': Installed after penetration flashing.  Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
 +
;(13) '''Protrusion Flashing''': Flange set in two continuous beads of accepted caulking.
 +
;(14) [[ASM Roof Systems Standard#9.2.1.7. Sealants |'''Sealant''']]: Applied around base of penetration flashing.
 +
;(15) '''Settlement Cap''': Material must match flashing material.  
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMDECK|'''Acceptable Deck''']]
+
;(A) [[ASM Roof Systems Standard#PART_2|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[ASM Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[ASM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Roof System Details'']]
  
[[RoofStar Guarantee Standards for ASM Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Assemblies]]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 17:35, 17 March 2023



Division D - Construction Details


ASM | Cylindrical Penetration (Split Panel Flashing) ( Article 12.3.1.2. and Article 12.3.2.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

ASM Details

ASM 11.1.2 Pipe Flashing, Split Panel.jpg

Print Sheet Under Revision

1 WORK INCLUDED

(1) Deck overlay
Required for continuous support of the underlayment when the deck is not suitable.
(2) Underlayment
The type of underlay required is determined by roof slope.
(3) Insulation
Offset and stagger layers 300 mm (12").
(4) Vapour-permeable separation membrane
Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels/ventilation material.
(5) Ventilation beneath panels
A ventilation/drying space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation/drying space facilitates drying as condensation forms on the underside of the metal panels (See Note A-8.1.3.5.).
(6) Bearing plate
Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
(7) Architectural metal panel clip
(8) Architectural metal roof panel (lower)
Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
(9) Overlap area of lower panel
Penetration flashing is mounted here, set in an acceptable sealant.
(10) Spaced Cleat
Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.
(11) Sealant
(12) Architectural metal roof panel (upper)
Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
(13) Protrusion Flashing
Flange set in two continuous beads of accepted caulking.
(14) Sealant
Applied around base of penetration flashing.
(15) Settlement Cap
Material must match flashing material.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to ASM Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.