Difference between revisions of "Drafting - Division A, C"

Jump to: navigation, search

Difference between revisions of "Drafting - Division A, C"

(PVC)
(Division C (Accepted Materials))
 
(149 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
__NOTOC__
 
__NOTOC__
 +
__NONUMBEREDHEADINGS__
 +
 
<big>This page is used for drafting new or revised wordings, before publishing</big>
 
<big>This page is used for drafting new or revised wordings, before publishing</big>
  
<big><big>Construction Details (holding pen)</big></big>
+
<div class="col-md-3">
<div class="col-md-4">
 
 
<hr>
 
<hr>
 +
===General Templates and Drafts===
 +
:<big>[[Draft Main Page of RPM]]</big>
  
===EPDM===
+
:<big>[[Draft Divison A]]</big>
<big>10 PERIMETERS and WALLS</big>
+
:<big>[[Draft Divison B]]</big>
:[[EPDM Details:D2.7.5-1 Roof-Wall Transitions (Expansion Joint)|D2.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction)''']]
+
:<big>[[Draft Divison C]]</big>
:[[EPDM Details:D2.7.5-2 Roof-Wall Transitions (Divider/Joint)|D2.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
+
:<big>[[Draft Divison D]]</big>
:[[EPDM Details:D2.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D2.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
+
:<big>[[Draft Divison E]]</big>
:[[EPDM Details:D2.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D2.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.2-1 Parapets & Copings (High - Wall Supported)|D2.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
 
 
 
:[[EPDM Details:D2.7.3-1 Edges & Fascia (Cant Edge)|D2.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.3-2 Edges & Fascia (Gravel Stop)|D2.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D2.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D2.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D2.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D2.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.4-7 Counter-flashings & Reglets (Window Curb)|D2.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction)''']]
 
 
 
<big>11 PERIMETERS and DRAINS</big>
 
:[[EPDM Details:D2.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D2.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.6-3 Curbs & Sleepers (Basic Curb)|D2.7.6-3 Curbs & Sleepers (Basic Curb)]]
 
:[[EPDM Details:D2.7.6-4 Curbs & Sleepers (Mechanical Opening)|D2.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 
 
 
:[[EPDM Details:D2.7.7-1 Strip-in Flashings (Metal Plumbing)|D2.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.7-2 Strip-in Flashings (Two-part Cable)|D2.7.7-2 Strip-in Flashings (Two-part Cable)]]
 
:[[EPDM Details:D2.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D2.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.8-1 Water & Drainage (Cast Iron Drain)|D2.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.8-2 Water & Drainage (Spun Copper Drain)|D2.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 
:[[EPDM Details:D2.7.8-4 Water & Drainage (Open Wall Scupper)|D2.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.8-5 Water & Drainage (Through-wall Scupper)|D2.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 
 
 
:[[EPDM Details:D2.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D2.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D2.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 
:[[EPDM Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 
 
 
 
</div>
 
</div>
 
+
<div class="col-md-3">
<div class="col-md-4">
 
 
<hr>
 
<hr>
  
===TPO===
+
===Division A (Scope, Use of Standards, and Guarantee )===
<big>10 PERIMETERS and WALLS</big>
+
:<big>[[Table Drafts 2 | Technical Committee composition]]</big>
:[[TPO Details:D3.7.5-1 Roof-Wall Transitions (Expansion Joint)|D3.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.5-2 Roof-Wall Transitions (Divider/Joint)|D3.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.2-1 Parapets & Copings (High - Wall Supported)|D3.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-1 Edges & Fascia (Cant Edge)|D3.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-2 Edges & Fascia (Gravel Stop)|D3.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-3 Edges & Fascia (Roof Edge)|D3.7.3-3 Edges & Fascia (Roof Edge)]]
 
 
 
:[[TPO Details:D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-7 Counter-flashings & Reglets (Window Curb)|D3.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction''')]]
 
 
 
<big>11 PERIMETERS and DRAINS</big>
 
:[[TPO Details:D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.6-3 Curbs & Sleepers (Basic Curb)|D3.7.6-3 Curbs & Sleepers (Basic Curb)]]
 
:[[TPO Details:D3.7.6-4 Curbs & Sleepers (Mechanical Opening)|D3.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 
 
 
:[[TPO Details:D3.7.7-1 Strip-in Flashings (Metal Plumbing)|D3.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.7-2 Strip-in Flashings (Two-part Cable)|D3.7.7-2 Strip-in Flashings (Two-part Cable)]]
 
:[[TPO Details:D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D3.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 
 
 
:[[TPO Details:D3.7.8-1 Water & Drainage (Cast Iron Drain)|D3.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-2 Water & Drainage (Spun Copper Drain)|D3.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 
:[[TPO Details:D3.7.8-4 Water & Drainage (Open Wall Scupper)|D3.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)|D3.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 
 
 
:[[TPO Details:D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 
:[[TPO Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 
  
 +
:<big>[[Scope of RPM and Standards]]</big>
 +
:<big>[[Structure and Organization of RPM and Standards]]</big>
 +
:<big>[[Guarantee]]</big>
 +
:<big>[[Specifying a RoofStar Guarantee]]</big>
 +
:<big>[[Limitations and Exclusions of Guarantee | Limitations and Exclusions (draft of Article 3.2.1.2., Guarantee, Div. A)]]</big>
 
</div>
 
</div>
 
+
<div class="col-md-3">
<div class="col-md-4">
 
 
<hr>
 
<hr>
  
===PVC===
+
===Division C (Accepted Materials)===
<big>10 PERIMETERS and WALLS</big>
+
:<big>[[RPM Templates Page]]</big>
:[[TPO Details:D3.7.5-1 Roof-Wall Transitions (Expansion Joint)|D3.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction''')]]
+
:<big>[[Material Page Template]]</big>
:[[TPO Details:D3.7.5-2 Roof-Wall Transitions (Divider/Joint)|D3.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
+
:<big>[[ASM Panel Page Template (for Active Members)]]</big>
:[[TPO Details:D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
+
:<big>[[Accessory Page Template]]</big>
:[[TPO Details:D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
+
:<big>[[Associate Member Page Template]]</big>
:[[TPO Details:D3.7.2-1 Parapets & Copings (High - Wall Supported)|D3.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
+
:<big>[[Active Member Page Template (ASM)]]</big>
:[[TPO Details:D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-1 Edges & Fascia (Cant Edge)|D3.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-2 Edges & Fascia (Gravel Stop)|D3.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-3 Edges & Fascia (Roof Edge)|D3.7.3-3 Edges & Fascia (Roof Edge)]]
 
 
 
:[[TPO Details:D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-7 Counter-flashings & Reglets (Window Curb)|D3.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction''')]]
 
 
 
<big>11 PERIMETERS and DRAINS</big>
 
:[[TPO Details:D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.6-3 Curbs & Sleepers (Basic Curb)|D3.7.6-3 Curbs & Sleepers (Basic Curb)]]
 
:[[TPO Details:D3.7.6-4 Curbs & Sleepers (Mechanical Opening)|D3.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 
 
 
:[[TPO Details:D3.7.7-1 Strip-in Flashings (Metal Plumbing)|D3.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.7-2 Strip-in Flashings (Two-part Cable)|D3.7.7-2 Strip-in Flashings (Two-part Cable)]]
 
:[[TPO Details:D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D3.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 
 
 
:[[TPO Details:D3.7.8-1 Water & Drainage (Cast Iron Drain)|D3.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-2 Water & Drainage (Spun Copper Drain)|D3.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 
:[[TPO Details:D3.7.8-4 Water & Drainage (Open Wall Scupper)|D3.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)|D3.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 
  
:[[TPO Details:D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
+
:<big>[[Division C - Search by System (under revision)]]</big>
:[[TPO Details:D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 
:[[TPO Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 
  
 +
:<big>[[Accepted Materials 1]]</big>
 +
:<big>[[Accepted Materials 2]]</big>
 +
:<big>[[Accepted Materials 2 | Accepted Materials Criteria]]</big>
 +
:<big>[[Materials Drafting 1 | Materials Drafting 1]]</big>
 
</div>
 
</div>
 
<div class="col-md-12">
 
<hr>
 
</div>
 
 
[[Construction Details (drafting page)]]
 

Latest revision as of 15:12, 26 October 2023