Search results

Jump to: navigation, search

Search results

  • #REDIRECT [[ASM 10.2.1 Roof-Wall Connection (Vented)]]
    54 bytes (5 words) - 16:35, 26 April 2019
  • <big><big><big><big><big>Standard for Architectural Sheet Metal (ASM) Roof Systems</big></big></big></big></big> | [[Notes to ASM Standard | Notes to Standard]]
    260 KB (36,048 words) - 21:32, 5 April 2024
  • ...les or raceways shall be permitted to pass through a ''roof assembly'' for connection to electrical equipment installed on the roof, provided that the passage th <li>{{hilite | ''Continuity'' means a sealed, resistive, continuous connection || 2024-June-15 }}
    465 KB (62,116 words) - 21:20, 5 April 2024
  • ...les or raceways shall be permitted to pass through a ''roof assembly'' for connection to electrical equipment installed on the roof, provided that the passage th <li>{{hilite | ''Continuity'' means a sealed, resistive, continuous connection || 2024-June-15 }}
    466 KB (62,225 words) - 22:19, 5 April 2024
  • <big><big><big><big><big>Standard for Architectural Sheet Metal (ASM) Roof Systems</big></big></big></big></big> | [[Notes to ASM Standard | Notes to Standard]]
    261 KB (36,152 words) - 22:24, 5 April 2024