WP Details:F1.7.5 (Expansion Joint - Deck Level)

Jump to: navigation, search

WP Details:F1.7.5 (Expansion Joint - Deck Level)

Revision as of 17:53, 23 December 2015 by James Klassen (talk | contribs) (WORK BY OTHERS)

F1.7.5.jpg


1 WORK INCLUDED

(1) Primary Waterproofing Membrane: Fully adhered to acceptable substrates (concrete slab depicted) install as per RGC Guarantee Standards E and Membrane Manufacturer's installation specifications.

(2) Membrane flashing (stripping): carried up wall minimum 200 mm (8") above deck surface and or a minimum of 100mm (4") above top surface of waterproofing assembly.

(3) Membrane Primer or Adhesive: proprietary primer or adhesive application and quantities as directed bymembrane manufacturer's published application specifications.

(4) Expansion Joint: Proprietary elastomeric expansion joint system compatible with waterproofing membrane system approved by membrane manufacturer and accepted by RGC. Designed to accommodate specific horizontal building movements and compliant with RGC Guarantee Standards E.

(5) Protection Board/Mat: Proprietary membrane protection board or mat approved by membrane manufacture compatible with waterproofing membrane system, and compliant with RGC Guarantee Standards E.

(6) Insulation: Optional: Extruded, Expanded Polystyrene, Type 4, CAN/ULC-S701-97, compressive strength of 240 kpa (35 psi). (7) Filter Mat: synthetic permeable fabric required over extruded, expanded polystyrene insulation overburdened with pavers, growing mediums, sand and gravel beds for unit masonry, etc.

(8) Metal Cap or Coping Flashing: Must overlap exterior wall finish. See RGC Guarantee Standard A6.9 & A6.10 for fastening and additional requirements.

(9) Metal Base Flashing: Required on all waterproofing assemblies. Flashing lengths joined by use of S-locks or standing seam joints.


2 WORK BY OTHERS

(A) Acceptable Deck: Concrete slab shown.

NOTE: Refer to RGC Guarantee Standards E for additional requirements.



Back to Waterproofing Application

Back to Waterproofing Construction Details

Back to Construction Details