Line 6: Line 6:
 
<big><big>Division D - Construction Details</big></big>
 
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
<big><big><big><big><big>EPDM | Membrane Termination B (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big>
+
<big><big><big><big><big>SBS | Metal Edge Termination ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edge | Article 10.3.4.2.]])</big></big></big></big></big>
 
{{Template:Construction Details Header}}
 
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
+
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-body">
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
 
<br>
 
<br>
[[File:10.3.2.3.-EPDM-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/c/c6/10.3.2.3.-EPDM-B.png]]
+
[[File:10.3.2.3.-EPDM-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/5/53/10.3.2.3.-EPDM-A.png]]
 
:Drawing NTS
 
:Drawing NTS
 
</div>
 
</div>
Line 22: Line 22:
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]:  
+
;(1) <big>Suitable field substrate</big>:  
:As specified by the Design Authority and installed to provide continuity for optimal control.
+
:May be the [[SBS Roof Systems Standard#PART_2| roof ''deck'']] or [[SBS Roof Systems Standard#PART_5 |''deck'' overlay]] (if an uninsulated system), or [[SBS Roof Systems Standard#PART_8| insulation and an overlay]] (if ''conventionally insulated'').
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:
+
;(2) <big>Primer or adhesive</big>:
:Installed in keeping with Section 7.3.  Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
+
:For self-adhered or adhered membranes, as required by the ''manufacturer''.
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:
+
;(3) [[SBS Roof Systems Standard#PART_9|<big>Base field membrane</big>]]:
:Required for fully adhered membrane systems or when overburden is specified.  Panels must be offset and staggered from underlying insulation panels.
+
:Carried continuously over the outside edge at least 50.8 mm (2”) downward, or 50.8 mm past any cold joint.
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:
+
;(4) <big>Sealant or mastic</big>:
:See Table 9.2. for permissible application methods and corresponding membrane properties.  Membrane must be installed according to the requirements in Section 9.3.
+
:Applied on membrane, beneath metal edge flashing.
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:
+
;(5) <big>[[SBS Roof Systems Standard#PART_13| Metal edge flashing</big>]] (flush with roof surface):
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
+
:Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows.
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:
+
:A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements).
:Edge securement must be anchored to the roof structure to prevent membrane movement.
+
;(6) [[SBS Roof Systems Standard#PART_9|<big>Membrane flashing strip</big>]]:
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:
+
:Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the ''manufacturer'' (primer illustrated).
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications.  All membranes applied to the vertical substrate must be fully adhered.
+
;(7) [[SBS Roof Systems Standard#PART_9|<big>Cap field membrane</big>]]:
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:
+
:Installed according to Part 9 requirements.
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements).  Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
+
;(8) <big>Edge mastic</big>:
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:
+
:Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane.  Coat with granules.
:All membranes applied to a vertical surface must be mechanically fastened. Fastener illustrated, together with sealant applied to upper membrane edge.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]
+
;(A) [[SBS Roof Systems Standard#PART_2|<big>Structural Roof Deck</big>]]
:Illustrated deck is representative.  See Sub-section 2.1.5. for acceptable deck types and conditions.
+
:Generic and representative only.
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]
+
;(B) [[EPDM Roof Systems Standard#PART_10|<big>Roof edge substrate</big>]]
:Illustrated wall is representative.  Wall control layers (i.e. water resistive barrier) must overlap roofing system to achieve continuity.  See Sub-section 2.1.7. for wall conditions.
+
:Wood blocking, required for conventionally insulated roofs.
;(C) <big>Wall System Finish</big>
+
;(C) <big>Wall assembly</big>
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).
+
:Generic and representative only.
  
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
Line 53: Line 52:
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.
+
'''NOTE''': See the [[SBS Roof Systems Standard | '''SBS Roof Systems Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]
+
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Roof System Details'']]
  
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
{{Tempate:RPM Page Footer with Copyright and Current Date}}
+
{{Template:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 21:50, 27 October 2025



Division D - Construction Details


SBS | Metal Edge Termination ( Article 10.3.4.2.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details


10.3.2.3.-EPDM-A.png

Drawing NTS

1 WORK INCLUDED

(1) Suitable field substrate
May be the roof deck or deck overlay (if an uninsulated system), or insulation and an overlay (if conventionally insulated).
(2) Primer or adhesive
For self-adhered or adhered membranes, as required by the manufacturer.
(3) Base field membrane
Carried continuously over the outside edge at least 50.8 mm (2”) downward, or 50.8 mm past any cold joint.
(4) Sealant or mastic
Applied on membrane, beneath metal edge flashing.
(5) Metal edge flashing (flush with roof surface):
Fasteners spaced no more than 203.2 mm (8”) on the top face in two offsetting rows.
A hemmed drip edge (shown) is required (Refer to Article 13.2.2.1. for fabrication requirements).
(6) Membrane flashing strip
Applied to the metal edge flashing and overlapping onto the field membrane at least 101.6 mm (4”). Prime when required by the manufacturer (primer illustrated).
(7) Cap field membrane
Installed according to Part 9 requirements.
(8) Edge mastic
Apply mastic or another membrane-compatible sealant to the outer exposed edge of the field cap sheet membrane. Coat with granules.

2 RELATED WORK BY OTHERS

(A) Structural Roof Deck
Generic and representative only.
(B) Roof edge substrate
Wood blocking, required for conventionally insulated roofs.
(C) Wall assembly
Generic and representative only.

NOTE: See the SBS Roof Systems Standard for additional requirements.


Back to SBS Roof System Details

Home